Download presentation
Presentation is loading. Please wait.
Published byFelicity McKinney Modified over 8 years ago
1
Central Asia: Experiences with Stakeholders Involvement into Transboundary Water Cooperation Vadim Sokolov Deputy Director Scientific-Information Center of ICWC Topic 3.1 Basin Management and Transboundary Cooperation. Session 3.1.2. Istanbul 20 March 2009
2
Central Asia map
3
What is Water Resources Management? Water resources management is an art to supply the required water volume (or level) with acceptable quality at the proper place and in proper time.
4
PROCESS OF WATER RESOURCES MANAGEMENT Criteria of Equitable and Reasonable Share/Quota Inclusiveness Negotiations Regulations Allocation Cost / Efficiency/ Life timeMaintenance & Operations Infrastructure IndicatorsTasksComponent Sustainable Development Production / Water Saving Good Service Assessment Demand Management Monitoring Development Protection Index of Non-Sustainable Use Product / MDGs Productivity (more crop per drop) Use / Utilization Equitability/Stability Minimum of unproductive losses Delivery Level / Volume / Quality / Time / Address Demands Renewability: Level/Volume/Quality/Variability Available Water Resources G o v e r n a n c e
5
We need to provide for WRM process proper WATER GOVERNANCE SYSTEM The main GOAL – to provide equal and democratic opportunities for all stakeholders involved in the water resources management process COMPONENTS: Political commitment – through democracy development Institutional arrangements – recognizing the integrity of water for nature and society within hydrographic boundaries Legislative framework – adapting to IWRM principles Financing and Incentives – through political decisions Inter-sector integration – through proper co-operation platform Public participation – through involvement into decision-making Managerial tools and instruments – through legislation and economic incentives and technical modernization Capacity development – raising human and technical potential Permanent adaptation to changes: natural, political, social, economic, technological
6
The Governance System should be distributed over the hierarchy levels of WRM Water Management Process Basin Organization Basin Council A c c o u n t a b I l I t y Government Sectors Zones National Water Authority National Water Council Parliament Finance Sectors \ provinces Sub-Basin \ Province Organization Sub-Basin Committee Local Administrations Sectors System Organization Union of Water Users Districts WUAs WUA Administration Public Committee Users \ Farmers Uses End User \ Farmer Delegation of responsibility
7
The Governance System at Basin level should provide coordination among Sectors Main Criteria: Inclusiveness (to have a voice - each can show its interest); Equity (opportunities – rights for equal access to water); Transparency; Effectiveness; Accountability; Coherency (to listen others); Responsiveness; Comprehensiveness; Ethical considerations Water EnergyAgricultureFinanceIndustryTourismEcosystemFisheries To create platform for effective participation in decision-making process of different stakeholders and sectors
8
THANKS FOR ATTENTION !!! THANKS FOR ATTENTION !!! More Information: www.cawater-info.net vadim@icwc-aral.uz
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.