1
Move 2 racks G16-RR2-4 G16-RR2-3
2
G15-PP-01 CKT 7-8-10-12 G15-PP-01 CKT 8-10-12 G15-PP-01 CKT 8 - 10 G15-PP-01 CKT 8 G15-PP-01 CKT 7-8-10-12 Power Feed
3
Remove these 2 Racks G17-RR1-1 G17-RR1-2 To make room for Corrector Racks G16-RR2-4 G16-RR2-3
4
Old 480V connections are capped off inside here
5
480 supply to the racks came from here, locked off, but still connected to DHP-BE-6
6
G17-RR1-1 Power via G15-PP-01 CKT 28 G17-RR1-2 Power via G15-PP-01 CKT 30
11
24 cables, 3 wires per cable except for quads, 5 wires per cable Use KN-T8’s for most = 20 cables x 3 wires x.31” per terminal = 18.6” Use KN-T6’s for quads = 4 cables x 5 wires x.39” per terminal = 7.8” Sums to 18.6 + 7.8 = 26.4” If KN-T6’s for all terminals = 80 wires x.39” per terminal = 31.2” Boxes found available so far: 30 x 18 x 4 36 x 24 x 8