AVAILABILTY BASED TARIFF
2
AVAILABILITY BASED TARIFF A RATIONAL TARIFF STRUCTURE A RATIONAL TARIFF STRUCTURE SCIENTIFIC SETTLEMENT SYSTEM …..COMPLEMENTS GRID SECURITY……RATHER THAN COMPROMISING IT !!! …..COMPLEMENTS GRID SECURITY……RATHER THAN COMPROMISING IT !!!
3
ABT AT WORK QUANTUM IMPROVEMENT IN SYSTEM PARAMETERS QUANTUM IMPROVEMENT IN SYSTEM PARAMETERS GRID FREQUENCY GRID FREQUENCY GRID FREQUENCY GRID FREQUENCY VOLTAGE PROFILE VOLTAGE PROFILE VOLTAGE PROFILE VOLTAGE PROFILE INNOVATIVE METHODS IN SYSTEM OPERATION INNOVATIVE METHODS IN SYSTEM OPERATION PUMP OPERATION AT KADAMPARAI PUMP OPERATION AT KADAMPARAI PUMP OPERATION AT KADAMPARAI PUMP OPERATION AT KADAMPARAI RE-ARRANGEMENT OF ELECTRICAL LOADS RE-ARRANGEMENT OF ELECTRICAL LOADS RE-ARRANGEMENT OF ELECTRICAL LOADS RE-ARRANGEMENT OF ELECTRICAL LOADS OPTIMAL UTILISATION OF RESERVOIRS OPTIMAL UTILISATION OF RESERVOIRS OPTIMAL UTILISATION OF RESERVOIRS OPTIMAL UTILISATION OF RESERVOIRS INTER REGIONAL TRADING INTER REGIONAL TRADING WIN-WIN SITUATION FOR BOTH REGIONS WIN-WIN SITUATION FOR BOTH REGIONS OPPORTUNISTIC UI TRANSACTIONS OPPORTUNISTIC UI TRANSACTIONS
4
FREQUENCY PROFILE
5
REALITY BITE: FARMERS IN KARNATAKA ARE HAPPY WITH FEWER HOURS OF QUALITY POWER!!. EFFICIENCY OF PUMPS AT TG HALLI WATER WORKS IMPROVED! COMPARISION OF BANGALORE VOLTAGE-TYPICAL DAY
6
WATER SUPPLY TO BANGALORE LOW VOLTAGE PROBLEMS AROUND BANGALORE HAMPERED WATER SUPPLY EARLIER WITH BETTER VOLTAGE NOW, PUMPING EFFICIENCY HAS IMPROVED 400 KV STATION AT MYSORE BEING COMMISSIONED ON WAR FOOTING TO FURTHER FORTIFY THIS PART OF THE GRID
7
KADAMPARAI OPERATION: TYPICAL DAY AROUND 700MU PUMPED SINCE JAN 2003
8
LOAD RE-ARRANGEMENT RESULTS IN SIGNIFICANT COST SAVINGS FOR THE CONSTITUENTS COMPARISION OF DEMAND IN SOUTHERN REGION-TYPICAL DAY
9
OPTIMAL RESERVOIR UTILISATION LINGANAMAKKI IN KARNATAKA ENERGY STORAGE IN MU (THIS YEAR) :- 1480MILLION UNITS ENERGY STORAGE IN MU (LAST YEAR) :- 834MILLION UNITS MORE THAN 400 MILLION UNITS OF ENERGY SAVED DUE TO IMPROVED OPERATIONAL EFFICIENCY AND OPTIMISATION MINIMUM /MAXIMUM HYDRO GENERATION BY KPTCL ON: 36mu on 26-jun-04 2.73mu on 16-May-04
10
HYDRO GENERATION KARNATAKA