Download presentation
Presentation is loading. Please wait.
Published byEleanor Allen Modified over 9 years ago
1
Question Period Roads _____________ Ron Davis Chief Engineer, MOF
2
Question Period Do the changes to roads happen right away?
3
Question Period Roads Cycle
4
Question Period Can you elaborate on the situations that require a DM to approve a RLAD?
5
Question Period There are only three scenarios where DM approval is required, is this the same after the transition?
6
Question Period What role do professional associations play in describing professional design responsibilities?
7
Question Period How does the transition process deal with wilderness roads?
8
Question Period Where are Deactivation Prescriptions required and what occurs in areas where there is no Deactivation Prescription?
9
Question Period What was behind the intention of reducing the road deactivation classes from 3 to 1?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.