Pine Mountain Lake Dredging Project Moffatt & Nichol Project Engineers Cooper Crane & Rigging, Inc. Contractor The Right Contractor Adaptability Communication.

Similar presentations


Presentation on theme: "Pine Mountain Lake Dredging Project Moffatt & Nichol Project Engineers Cooper Crane & Rigging, Inc. Contractor The Right Contractor Adaptability Communication."— Presentation transcript:

1 Pine Mountain Lake Dredging Project Moffatt & Nichol Project Engineers Cooper Crane & Rigging, Inc. Contractor The Right Contractor Adaptability Communication

2 Project Need: Improve Channel Flow & Water Quality Project Need: Restore Navigable Depth

3 Disposal Area Project Layout

4 REGULATORY Required Studies, Reports and Testing Standard Requirements $ Sediment Quality & Sources Biological Water Quality Vegetation/ Habitat CH 3 Hg +

5 Hydraulic Disposal REGULATORY Construction Conditions Thin Layer Placement to aid benthic recovery Construction Windows: Nov 1 – Mar 31 Placement within 10’ of lake bottom Diffuser at end of discharge pipe Silt Curtain (if needed)

6 CONSTRUCTION CHALLENGES Mobilization New Priest Grade

7 Toyo Portable Barge Toyo Pump CONSTRUCTION CHALLENGES Toyo Portable Barge

8 Excavator Portable Barge Material Handling Portable Barge CONSTRUCTION CHALLENGES Excavator Portable Barge

9 “Mechanical-Hydraulic” Disposal Hydraulic Disposal CONSTRUCTION CHALLENGES Material Disposal Portable Barge

10 CONSTRUCTION CHALLENGES Varying Material

11 CONSTRUCTION CHALLENGES Weather

12 THE CREW