Download presentation
Presentation is loading. Please wait.
Published byJacob Sharp Modified over 9 years ago
1
PETER HUGHES MOBILE +44 (0) 7766 916 541 EMAIL PETER.HUGHES@ARC1.CO.UK ARC BEST PRACTICES LIMITED 2 SYCAMORE STREET LONDON EC1Y 0SF UNITED KINGDOM TELEPHONE +44 (0) 20 7251 9784 WWW.ARC1.CO.UK MEASURING OP RISK EXPOSURE THE KEY TO A COMPLETE OP RISK MANAGEMENT PROGRAMME
2
February 22, 2006Operational Risk Management - The Right Way2 TODAY’S AGENDA THE FINITE OP RISK ENVIRONMENT THE BASIC CONCEPTS THE ARC1 WORKFLOW THE OP RISK MEASUREMENTS ARC1 SAMPLE SCREENSHOTS ARC1 SAMPLE DASHBOARDS ABOUT ARC1
3
February 22, 2006Operational Risk Management - The Right Way3 THE FINITE OP RISK ENVIRONMENT THE EFFECTIVENESS OF OP RISK MANAGEMENT IS LIMITED IF THERE IS NOT A FINITE RISK ENVIRONMENT A FINITE ENVIRONMENT FOR OP RISK IS WHERE: –THE TOTAL POPULATION OF OP RISK EXPOSURES IS QUANTIFIED AND A FINITE FRAMEWORK OF RISK CONTROL TOTALS IS ESTABLISHED –OP RISKS ARE REPORTED WITHIN A UNIFIED FRAMEWORK OF STANDARDISED CORPORATE RISK METRICS THAT CAN BE AGGREGATED AND CONSOLIDATED THIS IS WHAT ARC1 DOES!
4
February 22, 2006Operational Risk Management - The Right Way4 THE BASIC CONCEPTS END-TO-END TRANSACTION PROCESSING CYCLES ARE DECONSTRUCTED AND REDUCED TO ‘PROCESSES’ EACH PROCESS HAS THREE MEASURABLE PROPERTIES: –ACTIVITY –VOLUME –RISK SCORE BENCHMARK DATA COLLECTED IN 3 STANDARD TABLES WITH RISK QUOTIENTS / WEIGHTINGS ATTACHED: RISK DRIVERTABLES OPERATIONAL ACTIVITY DAILY VOLUMES CAUSES OF OPERATIONAL FAILURE 34 ACTIVITY QUOTIENTS 8 VOLUME BAND WEIGHTINGS 9 CATEGORY/30 SUB-CATEGORY SCORING TEMPLATES
5
February 22, 2006Operational Risk Management - The Right Way5 Infinity CONSTRUCT PROCESS HIERARCHIES MAP CURRENT / TARGET STATUS TO ARC1 TABLES: 1.ACTIVITY (34 ACTIVITY TYPES / RISK QUOTIENTS) 2.VOLUME (8 VOLUME BAND WEIGHTINGS) 3.RISK SCORING (9 CATEGORIES / 30 SUB-CATEGORIES) INPUT ACTION ITEMS RUN ARC1 THE ARC1 WORKFLOW
6
February 22, 2006Operational Risk Management - The Right Way6 THE OP RISK MEASUREMENTS ARC1 USES THREE BASIC MEASUREMENTS TO MONITOR AND TRACK OP RISK: –RISK CONCENTRATION OPERATIONAL SIZE – RISK WEIGHTED TRANSACTIONS COMBINATION OF ACTIVITY RISK QUOTIENT AND VOLUME BAND WEIGHTING EXPRESSED IN OPERATIONAL RISK UNITS (ORUs) –RISK MITIGATION INDICATOR - RMI REPRESENTS EFFECTIVENESS OF RISK COUNTERMEASURES EXPRESSED ON A SCALE OF ZERO TO 100 –VALUE-AT-RISK REPRESENTS POTENTIAL IMPACT OF OPERATIONAL FAILURE COMBINATION OF RISK CONCENTRATION AND RMI EXPRESSED IN OPERATIONAL RISK UNITS (ORUs)
7
February 22, 2006Operational Risk Management - The Right Way7
8
February 22, 2006Operational Risk Management - The Right Way8 Select peak daily value supported by the Process MAPPING PROCESS TO VOLUME BAND
9
February 22, 2006Operational Risk Management - The Right Way9
10
February 22, 2006Operational Risk Management - The Right Way10 GENERATE RISK MEASUREMENTS Generate risk measurements
11
February 22, 2006Operational Risk Management - The Right Way11 GENERATE RISK REDUCTION PLAN Construct risk reduction plans
12
February 22, 2006Operational Risk Management - The Right Way12 SAMPLE LOSS EVENT CAPTURE
13
February 22, 2006Operational Risk Management - The Right Way13 OP RISK OVERVIEW DASHBOARD
14
February 22, 2006Operational Risk Management - The Right Way14 DEPARTMENTAL ANALYSIS
15
February 22, 2006Operational Risk Management - The Right Way15 KEY RISK INDICATORS
16
February 22, 2006Operational Risk Management - The Right Way16 DEPARTMENTAL PROFILE
17
February 22, 2006Operational Risk Management - The Right Way17 ABOUT ARC1 PLUG-AND-PLAY / INTERNET, INTRANET OR STANDALONE PC / SQL DATABASE / SUPPORTS UNLIMITED USERS FULLY RESEARCHED OP RISK BENCHMARKS COMPILED OVER 6 YEARS OF CONTINUOUS APPLICATION AUDITABLE - STANDARDISED OP RISK MEASUREMENT TABLES LOSS EVENT CAPTURE AND REPORTING MODULE – ATTACHES OP RISK CONTEXT TO LOSS EVENTS COMPREHENSIVE REPORTING CAPABILITY: –SCORECARDS –RISK REDUCTION PLANS –MANAGEMENT DASHBOARDS – OP RISK MEASUREMENTS ACROSS THE COMPANY DRILLING TO INDIVIDUAL DEPARTMENT PROFILES THE ULTIMATE RISK PROFILING TOOL FOR BASEL II / PILLAR 2 RISK MANAGEMENT BECOMES A LEARNING EXPERIENCE
18
February 22, 2006Operational Risk Management - The Right Way18 CONTACTS ARC1 REPRESENTATIVE IN ROMANIA: PAUL COSTEA CREATIVE BUSINESS PARTNERS TEL. + (40) 722 301496 E-MAIL PAUL.COSTEA@CBP.RO
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.