Lab #4: Pull and Perfection MG/IE 3400 – Production System Design
2
The New Scenario … Products: Blue sapphire2/minute Black diamond2/minute Grey pearl1/minute Customers want clocks delivered in less than 1 minute
3
Pull Production Warehouse Material Flow Information Flow OUT Work Center IN A OUT Work Center IN C OUT Work Center IN B
4
Number of Kanbans k = # kanbans/signals (here, c=1) d = demand per unit time L = lead time = safety factor k = d L ( 1 + )
5
Little’s Law L = W Process ‘law’: WIP = production rate x lead time ‘steady-state’ performance
6
TimeWise What determines the production rate?
7
Back/Hand Assembly Blue Sapphire Black Diamond Gray Pearl Blue Sapphire Black Diamond Gray Pearl
8
Blue Black Gray Blue Black Gray Blue Black Gray Blue Black Gray Blue Black Blue Gray Blue Black Gray Visual Layout
9
How to Accomplish Lean Concurrently Solve Problems: Root cause Solve permanently Team approach Line and specialist responsibility Continual education Measure Performance: Emphasize Improvement Track trends 1.Design Flow Process Link operations Balance workstations capacity Redesign layout for flow Emphasize preventive maintenance Reduce lot sizes Reduce setup/changeover time 2. Total Quality Control: Worker responsibility Measure: SQC Enforce compliance Fail-safe methods Automatic inspection 3. Stabilize Schedule: Level schedule Underutilize capacity Establish freeze windows 4. Kanban Pull: Demand pull Backflush Reduce lot sizes 5. Work with Vendors: Reduce lead times Frequent deliveries Project usage requirements Quality expectations 6. Reduce Inventory More: Look for other areas Stores Transit Carousels Conveyors 7. Improve Product Design: Standard product configuration Standardize and reduce number of parts Process design with product design Quality expectations