MGT 563 OPERATIONS STRATEGIES Dr. Aneel SALMAN Department of Management Sciences COMSATS Institute of Information Technology, Islamabad
2
Recap Lecture 13 Six Sigma Basics Application of six sigma Barriers to implementation Why six sigma is successful DMAIC Methodology Elements of six sigma Application of all these tools (TQM, Six sigma, Lean, BPR)
3
What kind of capacity is needed? How much capacity is needed to match demand? When more capacity is needed? Where facilities should be located (location) How facilities should be arranged (layout) Facility planning answers: FACILITY PLANNING
4
CAPACITY (DEFINITION OF) The number of units a facility can hold, receive, store or produce in a period of time It is the upper limit or ceiling on the load that an operating unit can handle. It includes equipment, space, employee skills
5
STRATEGIC CAPACITY PLANNING Goal To achieve a match between the long-term supply capabilities of an organization and the predicted level of long-run demand Overcapacity operating costs that are too high Undercapacity strained resources and possible loss of customers
6
CAPACITY PLANNING QUESTIONS Key Questions: What kind of capacity is needed? How much capacity is needed to match demand? When is it needed? Related Questions: How much will it cost? What are the potential benefits and risks? Are there sustainability issues? Should capacity be changed all at once, or through several smaller changes Can the supply chain handle the necessary changes?
7
ISSUES TO BE CONSIDERED IN STRATEGY FORMULATION Capacity strategy Demand patterns Growth rate and variability Facilities (Cost of the building and operating) Technological changes (Rate and direction of technology changes) Behavior of competitors Availability of capital and other inputs.
8
TYPES OF PLANNING OVER A TIME HORIZON Add Facilities Add long lead time equipment Schedule Jobs * Schedule Personnel AllocateMachinery Sub-Contract Add Equipment Add Shifts Add Personnel Build or Use Inventory Long Range Planning Intermediate Range Planning Short Range Planning Modify CapacityUse Capacity * * * Limited options exist
9
1.impact the ability of the organization to meet future demands 2.affect operating costs 3.affect lead time responsiveness 4.are a major determinant of initial costs 5.involve long-term commitment of resources 6.affect competitiveness 7.affect ease of management 8.are more important and complex due to globalization 9.need to be planned for in advance due to their consumption of financial and other resources IMPORTANCE OF CAPACITY DECISIONS
10
CAPACITY MEASURES Design capacity Maximum output rate or service capacity an operation, process, or facility is designed for Effective capacity Capacity a firm can expect to attain given its product mix, methods of scheduling, maintenance and standards of quality. Design capacity minus allowances such as personal time, maintenance and scrap
11
Quality Performance objectives Dependability Supply Networks Process Technology Development and Organization Speed Flexibility Cost Resource Usage Market Competitiveness Decision areas Capacity (configuration) Issues include: Capacity levels Number of sites Size of sites Location
12
Capacity Strategy Configuring Capacity Managing Capacity Change Type of Capacity Overall Level of Capacity Location of Capacity Timing of Change Magnitude of Change Issues in capacity strategy Location of changed capacity
13
Forecast level of demand Changes in future demand Uncertainty of future demand Consequences of over/under supply Availability of capital Cost structure of capacity increment Economies of scale Flexibility of capacity provisions Some factors influencing the overall level of capacity OPERATIONS RESOURCES MARKET REQUIREMENTS Overall level of capacity
14
Issues include….. a LONG-TERM CAPACITY CHANGE STRATEGY NUMBER OF SITES LOCATION OF EACH SITE ALLOCATION OF TASKS TO EACH SITE CAPACITY OF EACH SITE
15
Questions: “Who should be involved in these decisions?” “How does the company make this type of decision?” NUMBER OF SITES and CAPACITY OF SITES LOCATION OF SITES ALLOCATION OF TASKS TO SITES LONG-TERM CAPACITY CHANGE STRATEGY Many small sites? Few larger sites? QuestionsOptions Supply side dominated? Demand side dominated? All sites make all products/services? Each site focuses on a few products/ services? Capacity leads demand? Capacity lags demand?
16
Why is capacity strategy important? Without an appropriate capacity strategy operations will always be struggling to supply markets in a competitive manner Getting capacity strategy right is the starting point for developing competitive operations
17
LONG-TERM CAPACITY CHANGE STRATEGY NUMBER OF SITES LOCATION OF EACH SITE CAPACITY OF EACH SITE ALLOCATION OF TASKS TO SITES What performance measures will all these decisions have a major impact on ? ? How should one judge a capacity strategy ?
18
2 4 6 8 10 12 0 024681012 Costs / Revenue ($) Volume in thousands of units Forecast demand = 9000 units Cost Revenue Cost, volume, profit illustration
19
12 3 4560 0 2 4 6 8 Unit cost (total cost / volume) Volume in thousands of units (a) Nominal capacity limit 1234560 0 2 4 6 8 Unit cost (total cost / volume) Volume in thousands of units (b) Diseconomies of scale kick in Unit cost curve
20
Physical capacity of facilities Effective Capacity Demand Volume Time Cash flow with extended physical capacity Cash flow with two identical capacity increments Cumulative cash flow Time Expanding physical capacity in advance of effective capacity can bring greater returns in the longer term
21
Required service level Geographical distribution of demand Economies of scale Supply costs Some factors influencing the number and size of sites OPERATIONS RESOURCES MARKET REQUIREMENTS Size and number of sites
22
Required service level Suitability of site Image of location Resource costs Land and facilities investment Resource availability Community factors Some factors influencing the location of sites OPERATIONS RESOURCES MARKET REQUIREMENTS Location of sites
23
CAPACITY RELATED CONCEPTS Actual output Rate of output actually achieved—cannot exceed effective capacity Utilization Actual output as a percent of design capacity Efficiency Actual output as a percent of effective capacity
24
Measure of how well a facility or machine is performing when used Efficiency Actual output Effective Capacity = EFFICIENCY (expressed as a percentage)
25
Measure of actual capacity usage of a facility, work center, or machine Utilization Actual Output Design Capacity = UTILIZATION (expressed as a percentage)
26
Actual output = 36 units/day Efficiency = = 90% Effective capacity 40 units/ day Utilization = Actual output = 36 units/day = 72% Design capacity 50 units/day EXAMPLE- EFFICIENCY/UTILIZATION Design capacity = 50 trucks/day Effective capacity = 40 trucks/day Actual output = 36 units/day
27
DETERMINANTS OF EFFECTIVE CAPACITY Facilities Product and Service Factors Process Factors Human Factors Policy Factors Operational Factors Supply Chain Factors External Factors
28
STRATEGY FORMULATION Strategies are typically based on assumptions and predictions about: Long-term demand patterns Technological change Competitor behavior
29
SPECIAL REQUIREMENTS FOR MAKING GOOD CAPACITY DECISIONS Forecasting the demand accurately Understanding the technology and capacity increments Finding the optimal operating level (volume) Building for change
30
KEY DECISIONS IN CAPACITY PLANNING Amount of capacity needed Timing of changes (frequency of capacity additions) Extent of flexibility of facilities External sources of capacity Need to maintain balance
31
AMOUNT OF CAPACITY NEEDED
32
STEPS OF CAPACITY PLANNING Estimate future capacity requirements Evaluate existing capacity and facilities and identify gaps Identify alternatives for meeting requirements Conduct financial analysis Assess key qualitative issues Select the best alternative for the long term Implement the alternative chosen Monitor results
33
Long-term considerations relate to overall level of capacity requirements Short-term considerations relate to probable variations in capacity requirements FORECASTING CAPACITY REQUIREMENTS
34
CALCULATING PROCESSING REQUIREMENTS Forecast sales within each individual product line Calculate equipment and labor requirements to meet the forecasts
35
CALCULATING PROCESSING REQUIREMENTS Calculating processing requirements requires reasonably accurate demand forecasts, standard processing times, and available work time
36
CALCULATING PROCESSING REQUIREMENTS
37
If the department works one eight hour shift, 250 days a year, calculate the number of machines that would be needed to handle the required volume. Solution: 5800/(250)(8) = 2.9 (3 machines are needed)
38
CAPACITY CUSHION Capacity Cushion Extra capacity used to offset demand uncertainty Capacity cushion = 100% - Utilization Capacity cushion strategy Organizations that have greater demand uncertainty typically have greater capacity cushion Organizations that have standard products and services generally have greater capacity cushion
39
SERVICE CAPACITY PLANNING Service capacity planning can present a number of challenges related to: The inability to store services The need to be near customer The degree of demand volatility
40
SERVICE CAPACITY PLANNING Time: Inability to store services for later consumption. Capacity must be available to provide a service when it is needed (capacity must be matched with the timing of demand) Location: Need to be near customers for convenience. Capacity and location are closely tied. Service goods must be at the customer demand point and capacity must be located near the customer Volatility of Demand: (Much greater than in manufacturing) Volume and timing of demand Time required to service individual customers
41
CAPACITY UTILIZATION & SERVICE QUALITY Best operating point is near 70% of capacity From 70% to 100% of service capacity, what do you think happens to service quality?
42
TIMING AND SIZE OF CHANGES (FREQUENCY OF CAPACITY ADDITIONS)
43
CAPACITY EXPANSION Factors to be considered: Volume and certainty of anticipated demand Strategic objectives for growth Costs of expansion and operation Incremental or one-step expansion Frequency of capacity additions
44
CAPACITY EXPANSION STRATEGIES (1 of 5) Expected Demand Time in Years Demand New Capacity Capacity leads demand with an incremental expansion Capacity leads demand with a one-step expansion Capacity lags demand with an incremental expansion Attempts to have an average capacity, with an incremental expansion
45
CAPACITY EXPANSION STRATEGIES (2 of 5) Expected Demand Time in Years Demand New Capacity Capacity leads demand with an incremental expansion
46
CAPACITY EXPANSION STRATEGIES (3 of 5) Expected Demand Time in Years Demand New Capacity Capacity leads demand with a one-step expansion
47
CAPACITY EXPANSION STRATEGIES (4 of 5) Expected Demand Time in Years Demand New Capacity Capacity lags demand with an incremental expansion
48
CAPACITY EXPANSION STRATEGIES (5 of 5) Expected Demand Time in Years Demand New Capacity Attempts to have an average capacity, with an incremental expansion
49
MAKE OR BUY? 1.Available capacity 2.Expertise 3.Quality considerations 4.Nature of demand 5.Cost 6.Risk
50
OPTIMAL OPERATING LEVEL
51
Average cost per room Best operating level Economies of scale Diseconomies of scale 2505001000 # Rooms
52
ECONOMIES OF SCALE Economies of scale If the output rate is less than the optimal level, increasing output rate results in decreasing average unit costs Reasons for economies of scale: Fixed costs are spread over a larger number of units Construction costs increase at a decreasing rate as facility size increases Processing costs decrease due to standardization
53
DISECONOMIES OF SCALE Diseconomies of scale If the output rate is more than the optimal level, increasing the output rate results in increasing average unit costs Reasons for diseconomies of scale Distribution costs increase due to traffic congestion and shipping from a centralized facility rather than multiple smaller facilities Complexity increases costs Inflexibility can be an issue Additional levels of bureaucracy
54
ECONOMIES OF SCALE Minimum cost & optimal operating rate are functions of size of production unit. Average cost per unit 0 Small plant Medium plant Large plant Volume or output rate
55
THE EXPERIENCE CURVE As plants produce more products, they gain experience in the best production methods and reduce their costs per unit Total accumulated production of units Cost or price per unit Yesterday Today Tomorrow
56
EXTERNAL SOURCES OF CAPACITY
57
IN-HOUSE OR OURSOURCE? Once capacity requirements are determined, the organization must decide whether to produce a good or service itself or outsource Factors to consider: Available capacity Expertise Quality considerations The nature of demand Cost Risks
58
NEED TO MAINTAIN BALANCE
59
BOTTLENECK OPERATION Machine #2 Bottleneck Operation Bottleneck Operation Machine #1 Machine #3 Machine #4 10/hr 30/hr Bottleneck operation: An operation in a sequence of operations whose capacity is lower than that of the other operations
60
BOTTLENECK OPERATION Operation 1 20/hr. Operation 2 10/hr. Operation 3 15/hr. 10/hr. Bottleneck Maximum output rate limited by bottleneck
61
CONSTRAINT MANAGEMENT Constraint Something that limits the performance of a process or system in achieving its goals Categories Market Resource Material Financial Knowledge or competency Policy
62
RESOLVING CONSTRAINT ISSUES Identify the most pressing constraint Change the operation to achieve maximum benefit, given the constraint Make sure other portions of the process are supportive of the constraint Explore and evaluate ways to overcome the constraint Repeat the process until the constraint levels are at acceptable levels
63
STRATEGIES FOR MATCHING CAPACITY TO DEMAND
64
Should capacity lead or lag demand ? Capacity leads demand Volume Time What competitive objectives will be affected? Capacity lags demand Volume Time Demand Capacity
65
The three options ….. Time Demand Capacity Volume Time Capacity Leading Strategy Demand Capacity Volume Time Capacity Lagging Strategy Demand Capacity Volume Time Capacity Smoothing Strategy
67
DEMAND MANAGEMENT STRATEGIES Strategies used to offset capacity limitations and that are intended to achieve a closer match between supply and demand Pricing Promotions Backorders Offering complementary products Discounts Other tactics to shift demand from peak periods into slow periods
68
CAPACITY MANAGEMENT STRATEGIES 1.Adjusting equipment and processes – which might include purchasing additional machinery or selling or leasing out existing equipment 2.Making staffing changes (increasing or decreasing the number of employees) 3.Improving methods to increase throughput 4.Redesigning the product to facilitate more throughput (for faster processing)
69
THINGS THAT CAN BE DONE TO ENHANCE CAPACITY MANAGEMENT 1.Design flexibility into systems 2.Take stage of life cycle into account 3.Take a “big picture” approach to capacity changes 4.Prepare to deal with capacity “chunks” 5.Attempt to smooth out capacity requirements 6.Identify the optimal operating level 7.Choose a strategy if expansion is involved