Presentation is loading. Please wait.

Presentation is loading. Please wait.

Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Information-Technology RTF Sub-Committee July 2, 2013 Mira Vowles, P.E., CEM Emerging.

Similar presentations


Presentation on theme: "Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Information-Technology RTF Sub-Committee July 2, 2013 Mira Vowles, P.E., CEM Emerging."— Presentation transcript:

1 Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Information-Technology RTF Sub-Committee July 2, 2013 Mira Vowles, P.E., CEM Emerging Technology Project Manager BPA Energy Efficiency

2 Slide 2 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Meeting Topics 1.IT Sub-Committee Overview (Mira) 2.DRAFT Measure Survey (Mira) 3.Data Center Dashboards (Ted with SCL) 4.Silicon Valley Data Center Energy Summit summary (Mary) 5.NEEA Data Center update (Geoff)

3 Slide 3 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N IT Sub-Committee 1.Sub-Committee of the Regional Technical Forum (RTF) 2.Purpose: develop and recommend data center measures with a)high consensus methodology to estimate and verify electrical savings b)specification for cost effective installations that ensures persistent savings 3.Minutes and presentations are posted at: http://rtf.nwcouncil.org/subcommittees/it/meetings.htm http://rtf.nwcouncil.org/subcommittees/it/meetings.htm

4 Slide 4 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N IT Sub-Committee DRAFT Work Plan Goal: to develop and recommend Information Technology (IT) measures to the Regional Technical Forum (RTF). Proposed first steps: 1.Prioritize measure focus, 2.Review baseline studies and 3.Review other research.

5 Slide 5 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Data Center Characterization Survey

6 Slide 6 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Data Center Characterization Survey

7 Slide 7 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Data Center Characterization Survey

8 Slide 8 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Data Center Characterization Survey

9 Slide 9 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Measure Survey Approximately how many data center project incentives have you provided?

10 Slide 10 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Measure Survey Approximately how many data center project incentives have you provided?

11 Slide 11 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Measure Survey

12 Slide 12 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Data Center Dashboards Ted Brown with Seattle City Light

13 Slide 13 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Silicon Valley Data Center Energy Summit Mary McEnroe with Silicon Valley Power

14 Slide 14 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N NEEA Data Center Update Geoff Wickes with NEEA

15 Slide 15 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Next Meeting: 8/6/13 at 1:30 pm Potential topics: NEEA Data Center updates (Geoff) ETO Data Center Baseline Study Other topics (all)

16 Slide 16 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N NEEA Data Center Market Study Geoff Wickes


Download ppt "Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Information-Technology RTF Sub-Committee July 2, 2013 Mira Vowles, P.E., CEM Emerging."

Similar presentations


Ads by Google