Download presentation
Presentation is loading. Please wait.
Published byTyler Newman Modified over 9 years ago
1
Netherlands Institute for Radio Astronomy 1 ASTRON is part of the Netherlands Organisation for Scientific Research (NWO) SKA AA-Mid Progress Meeting Johan Pragt 13-12-2011
2
2 SKA AA-Mid Progress Meeting Johan Pragt, 13-12-2011
3
Project SKA AA-Mid ASTRON resources mid2010–mid2013: 30 fte (SKA-NN) OPAR resources same period about: 10 fte (tbv) Hardware ASTRON >1.5 Meuro (SKA-NN) Milestones: First dualpol proto: Q3 2011 (about done) Dualpol tile(s) connected to test-station: Q2 2012 Dualpol next step connected to test-station:Q2 2013 goal full on site station: 2016. The project “SKA Noord-Nederland” is collaboration between ASTRON, Major, Neways, Isiterra and S&T. SKA-NN is supported by subsidies from the EC/EFRO program and the Samenwerkingsverband Noord-Nederland (SNN) Koers Noord program, and from the Province of Drenthe and Groningen.
4
Goal of the meeting Share information on technical progress Share / define AA-mid plan, cooperation Discussion within AA-mid groups and show the technical status and plans and wishes for near future. progress meeting on AA-mid including next steps. 4
5
Agenda AA-mid progress meeting 8:30 Observatoire de Paris, Nançay: BFC, LNA, Embrace progress and near future plans (Stephane Bosse, Steve Torchinsky) 9:15 Univ. of Manchester: ORA Technical progress, near future plans (Tony Brown (David Zhang)) 10:00 Break 10:30 ASTRON: Dual polarization design, thermal/environmental study, Embrace progress: (Dion Kant, Pieter Benthem, Marco Drost) 11:30 Management issues: (Johan Pragt, Dion Kant) dCoDR (draft) outcome Overall plan, global timeline, are we on track? Cooperation between teams, AA-low relations Process how to trade-off antenna design 12:15 AOB, Closure 5
6
Management Issues dCoDR (draft) outcome Overall planglobal timeline, are we on track? How to trade-off antenna designs Cooperation Active/Re-active contact, Regular telecons? AA-low relations The schedules seems to match, Beside backend, is there more to share? 6
7
dCoDR outcome See pdf with first reaction Is not the official reply from SPDO Good summary of items to work on 7
8
Overall plan Plans presented at delta Concept Design Review (dCoDR) global timeline, are we on track? How to trade-off antenna designs 8
9
Cooperation Cooperation Active/Re-active contact, Regular telecons? Progress meetings, Reviews, Decisions to schedule AA-low relations The schedules seems to match, Beside backend, is there more to share? 9
10
10 Any Other Business?? ??
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.