From US 17 to SR 11 and SR 11 to Cone Road FPID No. 240386-1-32-01 240387-1-32-01 October 25, 2011
2
PD&E Study Reevaluation Location Map Design FY 11/12 Design FY 13/14
3
Existing Typical Section Rural Typical Section 200 Feet of Existing Right-of-Way
4
Proposed Typical Section 4-Lane Rural Divided Arterial Minimum Design Speed = 65 mph Right-of-Way Acquisition –Interceptor Ditches: 0’-20’ additional right-of-way –Pond Sites Potential Trail
5
Volusia County Trail Master Plan VTPO Requested Evaluation 12-foot Wide, Paved, Multi-use Trail –South Side of SR 40 –Volusia County Standards –Trail Located At Right-of-Way Berm Between Ditches Wildlife Crossings – Adjacent to the Road with Barrier Separation Trailhead Locations Gaps to Existing/Funded Trails
6
Trail Location South Side of SR 40 –Advantages Reduced Right-of-Way Impacts and Costs Reduced Construction Costs –Disadvantages Requires Crossing SR 40 to Connect to Existing Trail in Ormond Beach. –Potential Crossing Point - Future Airport Boulevard Extension
7
Trail Costs Wetland Impacts – 6.42 Acres Conservation Easement Impacts – 0.87 Acres Trail Costs –Construction $5.75 M –Right-of-Way$2.50 M –Mitigation$0.85 M –Design and CEI$1.65 M –Total $10.8 Million Cost Estimates are for the Trail to be Completed as Part of the Widening Projects
8
Next Steps Maintenance Agreement From Volusia County Funding Agreement for Added Costs Design (Advertised in December) –Requires Scope to be Finalized by the end of November