Download presentation
Presentation is loading. Please wait.
Published byBethanie Jordan Modified over 8 years ago
1
Arctic FIDIPRO-EFES Workshop, Saariselkä, Finland April 20-24, 2009 SPIRAL2 at GANIL SPIRAL2 Phase 1 and Phase 2 New equipment at SPIRAL2 DESIR facility DESIR physics programme Bertram Blank CEN Bordeaux-Gradignan
2
Phase 1 2012 Accelerator S3 NFS DESIR RIB PRODUCTION Phase 2 2013/4 Existing GANIL facility
4
Spins&Shapes Position of drip-lines Position of drip-lines N=Z rp-process Heavy and Super Heavy Elements Heavy and Super Heavy Elements r-process path Haloes & Structures in the Continuum Equation of State Role of Isospin Equation of State Role of Isospin Spins & Shapes Shell structure far from stability Shell structure far from stability Neutrons for science Atomic & solid state physics Radiobiology & Isotope production Neutrons for science Atomic & solid state physics Radiobiology & Isotope production ISOSPIN DEGREES OF FREEDOM IN NUCLEAR FORCES ISOSPIN DEGREES OF FREEDOM IN NUCLEAR FORCES www.ganil.fr/research/developments/spiral2/
5
Particle Array Gamma Array AGATA PARIS GASPARD FAZIA EXOGAM 2 ACTAR NFS S3S3 DESIR 2006-2007: 19 Letters of Intent, 600 physicists from 34 countries 2008-2009: TDR for big instrumentation at SPIRAL2
6
DESIR Low-energy beams from: S1, S2, S3 S3 Production building SPIRAL2 (S2) GANIL – SPIRAL1 (S1) Désintégration, excitation et stockage d’ions radioactifs (Decay, excitation and storage of radioactive ions)
7
Projectile or target fragmentation at 95 MeV/A main interest: very neutron- and proton-rich light nuclei 1+ n+
8
Fission, fusion evaporation, DIC main interest: - fission products - medium-mass proton-rich nuclei UCx 2H2H IS UCxIS HI n 2H2H Target 2H2H IS n Target IS Converter
9
LISOL Gas catcher Fusion-evaporation reactions at Coulomb Barrier, DIC main interest: - very heavy nuclei - N=Z nuclei - very short-lived isotopes - refractory elements
10
to DESIR Identification station to CIME RFQ-HRS m/ m = 20000 SPIRAL2 Production
11
Optical studies for double HRS are under way: aim is m/ m = 20000 for 2 mm mrad to DESIR Identification station to CIME RFQ-HRS Teresa Kurtukian Nieto, CENBG
12
Length = 70 cm Radius = 3mm Florian Duval, Gilles Ban, Dave Lunney
13
Gas : Helium at 10 -2 mbar ΔE ≈ 0.18eV (before re- acceleration)
14
Without gas : 12 π.mm.mradHelium at 10 -2 mbar : 4.75 π.mm.mrad 4.75 π.mm.mrad @ 3keV → ≈ 1 π.mm.mrad @ 60keV Still under investigation : –RF heating –Residual gas effect outside the RFQ section –Charge-exchange process
15
Laser room (mezzanine) Meeting room (on top of DAQ) Kitchen + WC (on top of CR) MLL trap Collinear Laser spectroscopy -NMR RFQ bun- cher Penning trap + Decay setup Paul trap General purpose SAS Electronics Desk Access 5 m Beam from Level -1 TAS Neutron ditch Crane access to basement Double MOT General purpose IS Identification station with tape LN2 Gas & waste storage LUMIERE BESTIOL DAQ room Control room off-line source 2 off-line source 1
16
Supply Electri- city Gray Room 2 Gray Room 1 Assembly Room 3 Control Racks Interfaces HV supplies Crane access to basement Stor- age 1 Assembly Room 2 Assembly Room 1 Stor- age 2 Radio lab 5 m storage Limits of DESIR hall free Beam from Production building, S3 and SPIRAL1 Work shop X Identification and radioprotection measurements Neutron ditch
17
RFQ SHIRAC:Gilles Ban HRS: Bertram Blank DESIR building:Franck Delalee General purpose ion buncher GPIB + stable ion sources: Pierre Delahaye Identification station:Philippe Dessagne Beam transport lines: Francois Le Blanc Safety and security:Jean-Charles Thomas Command / Control, diagnostics:Stéphane Grévy
18
submitted on December 19, 2008 presented to SPIRAL2 SAC on January 29, 2009 strongly supported by SPIRAL2 SAC…. about 100 pages of technical description of DESIR facility and its equipment co-signed by 111 physicists and engineers of 15 countries contains a general description of buildings and interfaces description of major installations like traps, spectroscopy setups etc report available on DESIR web page (www.cenbg.in2p3.fr/desir)www.cenbg.in2p3.fr/desir
19
Collinear Laser spectroscopy: - spins - magnetic moments - quadrupole moments - change of charge radii -NMR spectroscopy: - nuclear gyromagnetic factor - quadrupole moment N=50, N=64, N=82, … Microwave double resonance in a Paul trap: - hyperfine anomaly and higher order momenta (octupole and hexadecapole deformation) Eu, Cs, Au, Rn, Fr, Ra, Am …. LUMIERE Laser tilisation for Measurement and Laser Utilisation for Measurement and Ionization of Exotic Radioactive Elements F. Le Blanc,Orsay G. Neyens, Leuven P. Campbell, Manchester
20
Decay studies with halo nuclei Clustering studies in light nuclei -delayed charged-particle emission: e.g. proton-proton correlation Super-allowed decays and the standard model of electro-weak interaction Deformation and Gamow-Teller distribution 2n correlations, P n and nuclear structure (r-process)... BESTIOL BESTIOL BEta decay STudies at the SPIRAL2 IsOL facility TETRA, Y. Penionzhkevich (Dubna) TAS, J.L. Tain (Valencia) setup, B. Blank (Bordeaux) M.J.G. Borge, Madrid
21
MLLTRAP High-accuracy mass measurements - unitarity of CKM matrix (V ud ): 50 Mn, 54 Co with M/M~10 -10 - transuranium isotopes (beams from S 3 ): M(Z>102) In-trap spectroscopy: - conversion electron and spectroscopy: shape coexistence Trap-assisted spectroscopy - decay studies of isomerically pure radioactive species P. Thirolf, Munich Set-up being installed at MLL/Garching
22
KVI atomic trapping facility New limits on scalar and tensor contributions in the weak interaction New limits on time-reversal violation in beta decay Systematic of atomic parity non-conservation in a long isotopic chain H. Wilschut, Groningen Experimental set-up at KVI
23
DESIR: 29 weeks of RIB/year: 10 weeks of RIB from SPIRAL2, 4 weeks from S3, 15 weeks from SPIRAL1 DESIR: 29 weeks of RIB/year: 10 weeks of RIB from SPIRAL2, 4 weeks from S3, 15 weeks from SPIRAL1 Standard planning; one production cave
24
Phase I Phase II
27
Main parts:estimated costs fund available RFQ and HRS « building »: included in SPIRAL2 project DESIR building + interfaces: 6000 k€ 2000 k€ (CPER) RFQ: 450 k€ + ? 320 k€ (CPER) HRS: 2000 k€ + ? - beam lines: 4500 k€ - off-line sources + GPIB: 290 k€ - identification station: 140 k€ - control / command, diagnostics: 400 k€ together with SPIRAL2
28
RFQ: on-going tests, study of “nuclearisation”, study of final version of RFQ HRS: detailed optical study of new ALPHA version, detailed mechanical study beam lines: preliminary design, cost estimate, detailed design study stable ion sources: definition, purchase GPIB: study and construction Identification station: preliminary design, detailed design, construction DESIR building: like SPIRAL2 Phase 2 construction program…. decision about construction at latest mid 2010 ……
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.