Presentation is loading. Please wait.

Presentation is loading. Please wait.

Bow Lake Elementary School SeaTac, Washington Elementary School New Construction BLRB Architects, p.s. 2008 Exhibition of School Planning and Architecture.

Similar presentations


Presentation on theme: "Bow Lake Elementary School SeaTac, Washington Elementary School New Construction BLRB Architects, p.s. 2008 Exhibition of School Planning and Architecture."— Presentation transcript:

1 Bow Lake Elementary School SeaTac, Washington Elementary School New Construction BLRB Architects, p.s. 2008 Exhibition of School Planning and Architecture

2 Bow Lake Elementary School

3 Multi-Purpose Room and Stage Community Environment: Formed from a public-public partnership between the city and the district, the City of SeaTac has a community room in the building, which is used as a community childcare center before and after school hours. This synergy between the school district and the city creates additional funding for the program, serving both public agencies at once. Community-use facilities such as the gymnasium and multi-purpose room are also strategically located in the building, allowing for convenient community access.

4 Student Courtyard - Looking toward the community-use facilities (Multi-Purpose Room & Gym)

5 Learning Environment: Consolidating two highly disparate schools into one, Bow Lake Elementary School blends the differences of students into a melting pot of educational opportunity. Home to the Deaf and Hard of Hearing Program, the Highly Capable Program and the English Language Learning Center, representing 66 languages, the school seamlessly intermixes students in four “neighborhoods”. Each neighborhood has a distinct identity, creating personalized small learning communities within the larger setting. Uniquely integrated, students are opened to an opportunity for curiosity and a world of perspective. “Grasslands” Neighborhood Entry and the Main Classroom Corridor

6 Learning Environment Cont.: Because of the small learning neighborhoods, students receive individualized attention, while gaining a broad educational experience. In addition, these communities have helped to retain the feel of a smaller school. Classroom with Operable Partition

7 Physical Environment: The two-story, 75,000 SF facility is organized to integrate and celebrate the school’s diversity, enriching and strengthening the educational experience for all. The facility provides a centralized administrative area, and offers flexible, personalized learning by creating small communities or “neighborhoods” around shared activity areas. There are 6 classrooms clustered around the shared activity room promoting collaboration and hands-on learning. Shared Activity Area

8 Shared Activity Area - With Operable Glazed System Open to Outdoors Physical Environment Cont.: The building further invites students to learn from the surrounding outdoor environment by providing operable glazed systems in each community that literally blurs the line between indoors and outdoors. The building's layout not only creates independent team areas, but also provides clearly defined, supervisable and logical internal circulation paths throughout the facility.

9 Main Entry Planning Process: Highline School District was facing tight budgets and shrinking enrollment leading to the decision to combine Valley View Elementary and Bow Lake Elementary. Each school represented to a unique student body. Bow Lake was home to mostly lower income students, as well as the Deaf and Hard of Hearing Program, and English Language Learning Center representing 66 languages. Valley View served predominantly upper middle class students and housed the District’s Highly Capable Program.

10 Administration Waiting Area Planning Process Cont.: Designing Bow Lake Elementary School brought together these two diverse communities of students, teachers, and learning styles. Through numerous planning and design meetings with teachers, staff and parents from both schools, new community was formed and a unified goal for the new school emerged. Constant school and district involvement during the design phase helped eradicate any feelings of turf wars. Because of collaborative planning and design meetings, the staff from each school had a large voice in the design of Bow Lake. The design was shaped by the voice of everyone involved, and the students and faculty from both schools ultimately embraced the consolidation.

11 Exhibition of School Planning and Architecture 2008 Project Data Submitting Firm :BLRB Architects, p.s. Project RoleArchitect Project ContactThomas L. Bates, FAIA TitleManaging Principal Address1145 Broadway Plaza, Suite 1200 City, State or Province, CountryTacoma, Washington 98402 Phone(253) 627-5599 Joint Partner Firm: Project Role Project Contact Title Address City, State or Province, Country Phone Other Firm: Project Role Project Contact Title Address City, State or Province, Country Phone Construction Firm:Porter Brothers Construction Project RoleGeneral Contractor Project ContactJerry Munro TitleProject Manager Address2222 Meridian Avenue East, Suite B City, State or Province, CountryEdgewood, Washington 98371 Phone(253) 927-2822

12 Exhibition of School Planning and Architecture 2008 Project Details Project Name Bow Lake Elementary School City SeaTac State Washington District Name Highline Public Schools Supt/President John P. Welch Occupancy Date September 2007 Grades Housed Grades K-5 Capacity(Students) 600 students Site Size (acres) 8.9 acres Gross Area (sq. ft.) 74,980 SF Per Occupant(pupil) 125 SF/pupil gross/net please indicate Gross Design and Build? No If yes, Total Cost: Includes: If no, Site Development: $2,800,000 Building Construction: $16,918,000 Fixed Equipment: $780,000 Other: Total: $20,498,000

13 Main Entry

14 Classroom Wings

15 View of Classroom Wings and Outdoor Gathering Area

16 View of Library from Student Courtyard

17 Library - Entry and Check-out


Download ppt "Bow Lake Elementary School SeaTac, Washington Elementary School New Construction BLRB Architects, p.s. 2008 Exhibition of School Planning and Architecture."

Similar presentations


Ads by Google