Download presentation
Presentation is loading. Please wait.
Published byPoppy Poole Modified over 9 years ago
1
1 MICE PID Group Meeting 11 May 2005 Update on Design & Safety Review Presented by Wing Lau
2
2 Work carried out so far: Design audits: Beam line & target (needs further revision) Fibre tracker (TRD to be modified to insert book marks) Cherenkov 2 (complete) Iron Shielding (TRD to be modified to insert bookmarks) Safety audits: Cherenkov 2 (Done) Iron Shielding (Done) Beam line & target (needs further revision)
3
3 Work expected to be done before the next MICE Collaboration Meeting: Design audits: Engineering infrastructures Safety audits: Engineering infrastructures Fibre trackers
4
4 Example of the work done so far: For the table summarising the work done to date, click: http://www.physics.ox.ac.uk/design/MICE/mice_design-safety_page.htm For the example on Cherenkov 2 Design audit, click: on the corresponding box in that table.
5
5 So far we have only received fed back from Ghislain on the Cherenkov 2 and the magnetic shielding design. We need the following urgently: A schedule with milestone dates on the PID components so that we can work out a realistic time table for the Design & Safety review on components: Cherenkov 1; TOF 0, 1 & 2; Calorimeter We also need to have a common design on the support structures on alll the PID components. Paul has asked me to initiate this and I would like to have the endorsement of this group before I can make a start. Action list
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.