Presentation is loading. Please wait.

Presentation is loading. Please wait.

The Template Surgery Tag line CQC Date. Introduction NHS Contract Approximately x patients Established over x years Purpose built surgery.

Similar presentations


Presentation on theme: "The Template Surgery Tag line CQC Date. Introduction NHS Contract Approximately x patients Established over x years Purpose built surgery."— Presentation transcript:

1 The Template Surgery Tag line CQC Date

2 Introduction NHS Contract Approximately x patients Established over x years Purpose built surgery

3 x partners x manager and x assistant manager x administrators x receptionists x nurses x health care assistants x patient advocate Training practice x Foundation doctor x GP Speciality Training Registrars x administrative apprentice Meet the Team (1)

4 Training practice xFoundation doctor Supervisor - Dr x x GP Speciality Training Registrars Supervisor - Dr x Student Doctors Supervisor - Dr x x Administrative Support Officer Supervisor - Mrs x Meet the Team (2)

5 Special Roles Dr x Learning disability Lead Coils Dr x Adult safeguarding lead Minor surgery Technology lead Dr x Child safeguarding lead (Duty Dr whilst absent) Contraceptive implants Mrs x Information governance lead Mrs x Caldicott guardian Sr x Infection contol (deputised lead) Meet the Team (3)

6 Our vision x

7 Team Aims To provide to our patients at all times 1.x 2.x 3.x 4.x 5.x 6.x 7.x 8.x

8 What have we done over the last 2 years? x X x

9 Strengths x

10 Weaknesses x

11 Plans for the future x

12 Thank you and Questions


Download ppt "The Template Surgery Tag line CQC Date. Introduction NHS Contract Approximately x patients Established over x years Purpose built surgery."

Similar presentations


Ads by Google