Presented by: Mark Fraysier Richard Jennings 11/28/2012
2
Testing equipment device for three-phase devices Analyzes how efficiently machines operate using desired, created load. Done by manipulating the power triangle
4
Research of cost reduction Communication between group members Reassured what our efforts would be during the beginning of EE 481
6
We met with Dr. Famouri Dr. Famouri suggested us to get rid of all systems except AC Switches DC Chopper Microprocessor Drive Circuits Zero Crossing Detector Filters This dramatically reduced the costs and complexity of the project
14
(See Microsoft Word Document)
15
Printed Circuit Boards were removed from our design This drastically increased the amount of labor to construct the hardware Surfboards Assembly
16
We completed nearly all hardware construction of the system as designed With + or – 10% tolerance The seven drive circuits were tested and operated correctly We ran out of time to do the software
17
We will attempt to manually generate our own pulse width modulation using lab supplies No microprocessor No zero crossing circuit No knobs
21
From the graph we determine that this load would work well with the generator However, the simulation does not include the effects of switching losses We must build the hardware to demonstrate switching losses Still, the simulation provides useful information about the system
22
The Drive Circuits functioned properly during independent testing. However, the turn-on rate for the MOSFETs appears to be insufficient for proper operation at 10 kHz. This may be remedied by adjusting component values in the Drive Circuits
23
An external housing would greatly improve the safety of the system. Proper design of the system makes failure unlikely, however operator misuse could result in injury or death due to electrocution.
24
Lack of proper communication with our mentor resulted in a lot of wasted time Wasted time resulted in our failure to have software operational We will test the system over the next several days using our own created PWM We won’t know the final results of the entire system performance until then
25
Have 4 group members 2 Electrical Engineers 1 Computer Engineer 1 Computer Scientist The computer engineer and computer scientist work on the software while the electrical engineers work on the hardware Include the automatic feedback and include a simple user friendly GUI
26
Incorporate externalized elements to create independently functional device Meters Display Power supply Power dump Add canceled features back into the system Computer interface Battery back-up Internal memory