Presentation is loading. Please wait.

Presentation is loading. Please wait.

SIS – Simplified Interline Settlement Financial Processes RA44 - Breakout Session Gianna Monsch, aerwise.

Similar presentations


Presentation on theme: "SIS – Simplified Interline Settlement Financial Processes RA44 - Breakout Session Gianna Monsch, aerwise."— Presentation transcript:

1 SIS – Simplified Interline Settlement Financial Processes RA44 - Breakout Session Gianna Monsch, aerwise

2 October 2010SIS P3 – Materials – ICH UG 2010 Financial Processes2 Agenda  Settlement: Form 1 vs. SIS  IS Calendar & ICH Calendar  IS Dashboard  Late Submissions  Suspension and Re-Instatement  Reports

3 Settlement: Form 1 vs. SIS October 2010SIS P3 – Materials – ICH UG 2010 Financial Processes3 ICH / ACH ICH F12 Upload / IS-WEB non migrated claims ACH Recap Sheet Prorate Engine Billed Entity Billing Entity ICH F3remains ACH Settlement Sheetunchanged Integrated Settlement Overall Processes Billing & Invoicing Processes Central Repository “Digital Signature” Company Overall Processes Processes at time of Sales NFP engine ARC COMPASS™ IS-WEB IS-XML IS-IDEC Usage File IS-WEB IS-XML IS-IDEC

4 October 2010SIS P3 – Materials – ICH UG 2010 Financial Processes4 Agenda  Settlement: Form 1 vs. SIS  IS Calendar & ICH Calendar  IS Dashboard  Late Submissions  Suspension and Re-Instatement  Reports

5 IS Calendar October 2010SIS P3 – Materials – ICH UG 2010 Financial Processes5 Submission Opens a few hours after previous period Submission Deadline Output Generation is two days after Submission Deadline Submission Opens before Output Generation of previous period

6 IS & ICH Calendar October 2010SIS P3 – Materials – ICH UG 2010 Financial Processes6 There is enough time to process the files submitted just prior to the deadline IS Submission Deadline is linked to ICH Closure Day

7 October 2010SIS P3 – Materials – ICH UG 2010 Financial Processes7 Agenda  Settlement: Paper vs. SIS  IS Calendar & ICH Calendar  IS Dashboard  Late Submissions  Suspension and Re-Instatement  Reports

8 IS Dashboard  Designed for Directors, Managers, etc  Includes Pax, Cargo, Miscellaneous and UATP  Consolidated and detailed view Gives billing carrier a great overview on files and invoices; and also shows the status of each invoice  Shaped to your needs Filter Criteria allow great report flexibility  Billing Member (in case of sponsored / aggregated members)  Billed Members  Billing Category  Settlement Method (ICH, ACH, Bilateral, etc)  Invoice Status  Downloadable Report can be downloaded in Excel / csv format (the colored dots are converted into codes) October 2010SIS P3 – Materials – ICH UG 2010 Financial Processes8

9 IS Dashboard – When to use it 1/2)  Multiple submissions by billing carrier SIS allows multiple submissions per billing category and day from your head office, decentralized teams, outsourced providers etc  IS Dashboard gives you an overview as well as details in order to keep track and control the files / invoices submitted  Invoices or File failed validation The alert for the validation failure might be sent to the expert in charge. However the Director, Manager, etc. would like/need to know this as well (without receiving an email alert)  IS Dashboard allows Directors, Managers, etc. to see this information at their discretion (without receiving a “failed validation” email alert) October 2010SIS P3 – Materials – ICH UG 2010 Financial Processes9

10 IS Dashboard – When to use it 2/2)  Late Submissions If your file (IS-IDEC or IS-XML) is late (after the IS-Submission Deadline), then you would like to tell SIS, that a specific file / invoice has to be handled as “Late Submission”  IS Dashboard is the place to mark files / invoices as as “Late Submissions”  Increase Period within current billing month You have submitted a file after the IS-submission deadline. It failed validation, but you do not want to go through “Late Submission”.  IS Dashboard allows you to increase the billing Period within the billing month; the invoices / file is then processed. October 2010SIS P3 – Materials – ICH UG 2010 Financial Processes10

11 October 2010SIS P3 – Materials –ICH UG 2010 SIS Overview Plenary 11 Invoice or File Status Invoice Details (when received, when processed, etc.) Search / View Criteria (e.g. Validation failed) Download (csv)

12 October 2010SIS P3 – Materials – ICH UG 2010 Financial Processes12 Agenda  Settlement: Paper vs. SIS  IS Calendar & ICH Calendar  IS Dashboard  Late Submissions  Suspension and Re-Instatement  Reports

13 Late Submissions October 2010SIS P3 – Materials – ICH UG 2010 Financial Processes13 Billed Entity Integrated Settlement Billing Entity IS-WEB IS-XML IS-IDEC IS-WEB IS-XML IS-IDEC ICH / ACH 2 Create invoice & flag Submit invoice Submit invoice  flag on dashboard 3 4 Alert 5 Accept - Passes validation - Normal process Decline - Fails validation 6 7 Alert Inform CH 1

14 October 200914 Late Submissions – Solution (1/2) Billing Carrier  Contacts ICH or ACH Operations as today  IS-WEB: flags the invoice directly  IS-IDEC & IS-XML: submits the file  “Processing Dashboard”: flags the file or invoice(s) SIS:  Based on flag  alert to ICH or ACH Operation  IS-Validation will be completed ICH or ACH Operation  Based on alert: accepts or declines “Late Submission” SIS P3 – Materials – ICH UG 2010 Financial Processes

15 October 200915 Late Submissions – Solution (2/2) SIS:  ICH or ACH Operation – accepted  Invoice(s) go through whole IS process  Settlement File to ICH or ACH  ICH or ACH Operation – declined  Invoice(s) remain on Validation Failure ICH or ACH Operations  Alert to billed carrier SIS P3 – Materials – ICH UG 2010 Financial Processes

16 October 2010SIS P3 – Materials – ICH UG 2010 Financial Processes16 Agenda  Settlement: Paper vs. SIS  IS Calendar & ICH Calendar  IS Dashboard  Late Submissions  Suspension and Re-Instatement  Reports

17 Suspension & Re-Instatement October 2010SIS P3 – Materials – ICH UG 2010 Financial Processes17 Billing Entity IS-WEB IS-XML IS-IDEC ICH / ACH Member Profile 1 Set suspension flag 4 Remark Screen & Report ICH: flagged invoices for information 3 5 Remove flag Resubmission Screen & Report 6 2 Flag invoices - Already processed - New submissions Alert

18 October 200918 Suspended Members 1/2 Suspension Flag in Member Profile  ICH or ACH Operations set suspension flag in Member Profile & defines number of periods to be flagged retroactively Flag transaction in SIS  SIS flags already processed invoices (retroactive flag)  SIS flags all new submissions  Optional alert to billing carrier ICH  SIS submits suspended invoices to ICH for information only (no settlement)  Shown in ICH on an F3 suspended member report  Excluded from the normal ICH F3 settlement report SIS P3 – Materials – ICH UG 2010 Financial Processes

19 October 200919 Suspended Members 2/2 Remark screen and suspension reports  Carrier can enter remarks to invoices which will be shown in all future reports  Suspension reports shows all suspended invoices Normal process as today until “re-instatement” of member Suspension Flag removed in Member Profile  ICH or ACH Operations remove suspension flag in Member Profile Re-submission of processed invoices for settlement  Carrier can re-submit already processed invoices to ICH and ACH  Suspension report will be updated automatically Note: “Bilateral” invoices are not impacted SIS P3 – Materials – ICH UG 2010 Financial Processes

20 October 2010SIS P3 – Materials – ICH UG 2010 Financial Processes20 Agenda  Settlement: Paper vs. SIS  IS Calendar & ICH Calendar  IS Dashboard  Late Submissions  Suspension and Re-Instatement  Reports

21 Reports Overview A variety of reports are available in SIS All reports are displayed immediately on the screen and can be downloaded in PDF or csv  Payable invoice report  Analysis Reports  Processing Reports  Operational Reports  Member / Contact Reports  SIS Usage Report  View ICH Reports October 2010SIS P3 – Materials – ICH UG 2010 Financial Processes21

22 October 201022 Thank you. Email: sis@iata.org SIS Website:  www.iata.org/sis www.iata.org/s SIS P3 – Materials – ICH UG 2010 Financial Processes


Download ppt "SIS – Simplified Interline Settlement Financial Processes RA44 - Breakout Session Gianna Monsch, aerwise."

Similar presentations


Ads by Google