Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, 23-34 July 2004 VIRGO commissioning progress report
2
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, 23-34 July 2004 Status in C4 l Recombined locked (full Virgo with PR misaligned) l Arms automatic alignment l Top stage tidal hierarchical control l Second stage of frequency stabilization (laser frequency controlled with the ITF common mode)
3
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, 23-34 July 2004 C4 sensitivity
4
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, 23-34 July 2004 After C4: hardware operation l Installation of new terminal benches support: terminal photodiode movements solved, possibility to perform DC drifts control l Rearrange optics on terminal benches: spherical aberrations solved, Gouy phase and telescope tuning for AA possible l MC mirror cleaning & check: attempt to reduce the scattering inside the Mode Cleaner, with no result (scattering still there) l ….
5
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, 23-34 July 2004 After C4: action performed l IB drift from the NE quadrants DC: not finished l BS drift control from the WE quadrants DC: complete l BS automatic alignment (as on the WI mirror): not yet finished l Low noise coil drivers (switch from high power for lock acquisition to low noise for lock keeping): complete l Compact DSP cards to overcome DSP memory limits: complete l IB local control acting from the marionette: complete l ‘New’ cavities automatic alignment: complete l Cavity full hierarchical control via marionette: not yet finished l M6 replacement (beam attenuation to 10%) to reduce the feedback from the PR in the IMC: complete
6
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, 23-34 July 2004 After C4: main control upgrades summary l NE filter 7 control: chain resonance (16 mHz) and filter 7 movement damping l IB control from the marionette: reduction of resonances in the IB control (introduced through the bench coils) l New coil drivers: reduction of DAC noise on the RM coils l Beam splitter automatic alignment: BS drift control and AC AA on the BS as on the WI mirror l Marionette control started (demonstrated successfully on a single arm) but need AA and SSFS to go on l Recycling locking started (stable lock of state 3) but need AA and new M6 to go on (PR feedback inside the IMC makes the system unstable)
7
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, 23-34 July 2004 Filter 7 control l LVDT used as sensor and actuator (in different frequency ranges) to damp the Filter 7 motion; l Damp the 16 mHz motion (chain mode), active up to 100 mHz; l Used only for damping
8
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, 23-34 July 2004 Chain resonance damping from Filter 7 ON OFF 32 mHz 16 mHz 32 mHz
9
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, 23-34 July 2004 IB marionette control l In C4 the Injection Bench was controlled locally through the IB bench coils; l Many resonances (bench, wires, Reference Cavity, …) where detected in the ITF signal; l A new control of the IB through the marionette has reduced or made disappear many of these peaks.
10
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, 23-34 July 2004 IB marionette control IB coils control Marionette control
11
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, 23-34 July 2004 New low noise coil drivers DAC noise: 300 nV/sqrt(Hz) (17.5 effective bits) Coil Driver noise: 80 nV/sqrt(Hz)
12
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, 23-34 July 2004 New low noise coil drivers The required additional force for lock acquisition is provided by a transconductive amplifier. During lock acquisition phase only DAC 1 is used. During linear phase DAC 1 output set to zero and DAC 2 is used to keep the lock.
13
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, 23-34 July 2004 BS control l AC control of the AA added to the BS: local controls switched off; l DC BS drift using the West End quadrants on; l Never tested AC and drift correction together;
14
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, 23-34 July 2004 Cavity marionette control l Full hierarchical control of a cavity closed: RM+Marionette+IP tidal control l Yet without AA and Second Stage of Frequency Stabilization l Tested soon the full hierarchical control with AA and SSFS
15
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, 23-34 July 2004 North cavity full hierarchical control No change in the cavity power when control starts
16
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, 23-34 July 2004 North cavity full hierarchical control RMS reduction by a factor 3 at low frequency
17
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, 23-34 July 2004 Recycling locking: state 3 Lock of the central cavity (CITF) on the sidebands + lock of the north arm (on the carrier) achieved
18
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, 23-34 July 2004 Virgo in state 3: effect of the PR alignment in the IMC When the PR is aligned fringes in the power inside the IMC appears: frequency noise, prenvents locking
19
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, 23-34 July 2004 Beam attenuation: M6 replacement l The light reflected in the IMC is partially scattered by the MC in the Virgo beam direction, creating spurious fringes; l The fringes in the IMC make frequency noise,which prevents the PR locking; l To temporary solve the problem of the PR feedback in the IMC it has been decided to attenuate the beam entering in the ITF by a factor 10 (factor 100 attenuation of fringes in the IMC; l To do this the last mirror injecting the beam in the ITF has been replaced with a 10% reflective mirror.
20
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, 23-34 July 2004 M6 replaced with a 10% reflecting From the laser To the interferometer M6 IMC Reference Cavity
21
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, 23-34 July 2004 After M6 replacement l Virgo is now working with 10% of the C4 power (about 0.7 W on the PR instead of the former 7 W); l Electronics and controls scaled to 10% power; l Recombined realigned and locked; l Arms automatic alignment restarted; l Fringes in the IMC when the ITF and the PR are aligned are strongly reduced; l Tests for full Virgo locking have started.
22
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, 23-34 July 2004 Future upgrade: new Injection Bench? l The PR reflection inside the IMC are a problem: the MC scattering in the IMC axis direction creates instabilities; l An isolation is necessary: on the present Injection Bench there is no space for a Faraday Isolator; l A new Injection Bench will be probably made: its main difference will be the presence of a Faraday Isolator; l The expected installation should take place in the begin of next year. In the meanwhile Virgo will work with 10% of its power.
23
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, 23-34 July 2004 New Injection Bench 900 mm Faraday Isolator
24
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, 23-34 July 2004 Progress in sensitivity
25
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, 23-34 July 2004 Changes with respect to C4 l Sensitivity measured before replacing M6 with the 10 % reflecting mirror (7 September 2004): Low noise RM coils drivers; No BS control at the level of the RM (no drift; correction, no marionetta notches compensation); BS drift control (WE quadrants DC through BS marionette); IB marionette control; Input mirrors coils disconnected
26
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, 23-34 July 2004 7 September data taking BS control upgrade Frequency stab.problems (?)
27
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, 23-34 July 2004 Next steps l In the next month the activity will be directed to the locking of the full Virgo; l The PR locking test have already started; l In the 10-100 Hz the noise is dominated by frequency or angular jitter noise coming from the Injection system: coupling with acoustic noise? IB internal resonances? This problem is being investigated.
28
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, 23-34 July 2004 Next run planned conditions l PR locking l Arms marionette control l Better BS control l New coils drivers l Full Automatic Alignment l … l When? (in one month from now?)