Download presentation
Presentation is loading. Please wait.
Published byJessica Sara West Modified over 8 years ago
1
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003
2
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 2 CSCs are the forward precision muon system of ATLAS 32 four-layer chambers 2.0 < | | < 2.7 |Z| ~ 7m, 1 < r < 2 m 4 gas gaps per chamber 31,000 channels 32 four-layer chambers 2.0 < | | < 2.7 |Z| ~ 7m, 1 < r < 2 m 4 gas gaps per chamber 31,000 channels IP
3
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 3 Mechanics: 32 chambers Gas system Electronics enclosure HV power Electronics On-detector: 32 x 5 = 160 sets of ASM boards 160 x 3 = 480 optical links LV power & cooling Calibration system Off-detector: 16 RODs TTC, trigger/DAQ interface Software CSC Deliverables BNL Physics Dept. BNL Instrumentation Div. UCI Physics Dept.
4
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 4 Building 832 CSC Production Facility Lab A (main clean room) configured for: u Panel epoxy operations. u Gas Bar and Wire Fixation Bar epoxy installations. u Tooling fabrications (epoxy steps). u Wire Winding and Epoxy setting operations. u Wire Spacing and Tension Tests. u Panel Flatness Tests ( mechanical and electrical). u Chamber Assembly and Electronic Flatness Tests. u High Voltage Cable and Connector installations.
5
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 5 Building 832 CSC Production Facility Lab B ( multiple table stations ) configured for: u Connector and part preparations. u Soldering operations on Y-Y, X-X, and Y- Cover Panels u X-X Panel “later steps” u Storage of all constructed Chambers
6
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 6 Panel Travelers – Part A
7
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 7 Panel Travelers – Part B
8
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 8 X-X Panel Curing
9
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 9 Soldering Connectors
10
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 10 X-X Panel Wire Winding
11
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 11 Electronic Flatness Testing
12
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 12 L-2 Ch. 10 Gap 4
13
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 13 Faraday Cage Prototype
14
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 14 CSC Panel Production Rates Tooling Capacity 65 80 S-1 L-2 80
15
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 15 CSC Parts LOB
16
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 16 CSC Chamber Production Plan 16 S-1 L-2 34
17
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 17 CSC On-detector Electronics ASM1: Preamp/shaper ASM2: Analog memory, ADC & MUX
18
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 18 Off detector electronics ROD prototype GPU Crate
19
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 19 Status of major deliverables On-detector 3 custom ASICs ready for production ASM1 board ready for production ASM2 board Rad-soft proto beam-tested Aug. ’02 Rad-hard proto in design Production quantities of most components in hand Cooling and calibration in design
20
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 20 Deliverables con’t. Off-detector ROD, GPU Prototypes assembled Most functions have been exercised and tested Design and layout seem suitable for production Production quantities of most components on hand Firmware development proceeds through 2003 Transition module First proto 3Q ’02 (not full density) Final version in design Software in development Beam test/system test scheduled for 8/03
21
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 21 On-detector electronics production 3 BNL-designed custom ICs preamp/shaper (2560), digital mux (2560), clock buffer (160) all Agilent 0.5um CMOS prototyping & procurement through MOSIS PRR June ’03 P/S, MUX shared reticle production CK BUF – small quantity, cheapest to buy MPW overruns 2 other custom ASICs SCA, Pos. VREG tested and qualified elsewhere in ATLAS shared procurement with other ATLAS subsystems - done 4 COTS components opamp, ADC, PECL rcvr., G-link tested and qualified elsewhere in ATLAS shared procurement (opamp, ADC, PECL) with LArg – underway preamp/shaper production test fixture
22
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 22 Milestones June 03Custom chips PRR & begin production Aug 03Rad-hard ASM2 proto System integration test Oct 03ASM boards PRR & begin production Custom chips in hand Nov 03CSC chamber production complete ROD PRR Early 04Assemble & test ASM boards Begin installing electronics on chambers Late 04Certify CSCs, ship to CERN
23
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 23 Radiation
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.