Steering Committee 69 “Training and Developing Tomorrow’s NATO Air Warriors Today!” FY15 Wing Commander Projects Colonel Gregory Keeton Wing Commander March 2015 1
2
Current DescriptionEstimate Aircraft Paint Barn Renovation$2,000K TOTAL$2,000K Alternative FY15 Projects Replace Cooling Tower (Building 2320)$500K Aircraft Composite Maintenance Clean Room (Building 2320)$380K Taxiway J Shoulder Repair$450K Repair and Upgrade Electrical Systems, Shop Areas (Building 2320)$210K Repair Electrical Distribution Hangar 2406$200K Replace Roof Hangar 2402$260K TOTAL$2,000K FY15 Wing CC Projects (Alternative Proposal) 2
3
Replace Cooling Tower (Building 2320) Supports the cooling system for the entire ENJJPT Squadron Ops Building 12 years old and beyond economical repair…normal service life is 7 – 9 years Rated RED by installation’s civil engineer “Most likely of any cooling tower at Sheppard AFB to go inoperable at any time.” No feasible work around if failure occurs during the peak summer heat periods 3
4
Composite Clean Room Advanced Composite Clean Room Zero particle “clean” room needed to accomplish repair to composite fiberglass and carbon fiber aircraft panels and components New T-38 flight controls New T-38 -33 wing panels T-6 flight controls and engine cowling panels Without clean room, maintenance and repairs or composite components is not authorized which would require shipping components for repair or purchasing new components 4
5
Taxiway J Shoulder Repair Existing shoulders must be repaired Originally installed in 1959 Adjacent to T-6 power check pads and ENJJPT ramp Asphalt surface is brittle, crumbling and creating FO No longer maintainable…“unsustainable” Existing shoulder width reduced from 50’ 30’ width for east shoulder to Taxiway Kilo for emergency vehicle access from the north fire station 10’ width for west shoulder Shoulder area not repaved returned to sod
6
Taxiway J Shoulder Repair ENJJPT Ramp T-6 Power Check Pad North Fire Station Emergency Vehicle Access AGE Storage
7
Other Repair and Upgrade Electrical Systems, Shop Areas (Building 2320) Upgrade electrical panels and circuits to reduce partial outages Repair Electrical Distribution Hangar 2406 (T-38 Phase Dock) Provide additional outlets for T-38 maintenance Replace worn out electrical panels which overheat during summer months Replace Roof Hangar 2402 (Paint Barn) Roof leaks during rain events in several locations within the paint room negatively impacting aircraft painting operations 7
8
QUESTIONS/COMMENTS RAISE WARRIORS!!! 8