PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e 1-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.

Similar presentations


Presentation on theme: "PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e 1-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall."— Presentation transcript:

1 PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e 1-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. 1-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. 1-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. 8-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. 8 Aggregate Planning in a Supply Chain

2 8-2Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Learning Objectives 1.Identify the decisions that are best solved by aggregate planning. 2.Understand the importance of aggregate planning as a supply chain activity. 3.Describe the information needed to produce an aggregate plan. 4.Explain the basic trade-offs to consider when creating an aggregate plan. 5.Formulate and solve basic aggregate planning problems using Microsoft Excel.

3 8-3Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Role of Aggregate Planning in a Supply Chain Capacity has a cost and lead times are often long Aggregate planning: –process by which a company determines levels of capacity, production, subcontracting, inventory, stockouts, and pricing over a specified time horizon –goal is to maximize profit –decisions made at a product family (not SKU) level –time frame of 3 to 18 months –how can a firm best use the facilities it has?

4 8-4Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Role of Aggregate Planning in a Supply Chain Specify operational parameters over the time horizon –Production rate–Subcontracting –Workforce–Backlog –Overtime–Inventory on hand –Machine capacity level All supply chain stages should work together on an aggregate plan that will optimize supply chain performance

5 8-5Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Information Needed for an Aggregate Plan Aggregate demand forecast F t for each Period t over T periods Production costs –Labor costs, regular time ($/hr) and overtime ($/hr) –Subcontracting costs ($/hr or $/unit) –Cost of changing capacity – hiring or layoff ($/worker), adding or reducing machine capacity ($/machine) Labor/machine hours required per unit Inventory holding cost ($/unit/period) Stockout or backlog cost ($/unit/period) Constraints – overtime, layoffs, capital available, stockouts, backlogs, from suppliers

6 8-6Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Outputs of Aggregate Plan Production quantity from regular time, overtime, and subcontracted time Inventory held Backlog/stockout quantity Machine capacity increase/decrease A poor aggregate plan can result in lost sales, lost profits, excess inventory, or excess capacity

7 8-7Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Identifying Aggregate Units of Production Aggregate unit should be identified in a way that the resulting production schedule can be accomplished in practice Focus on the bottlenecks when selecting the aggregate unit and identifying capacity and production times Account for activities such as setups and maintenance

8 8-8Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Red Tomato Tools Family Material Cost/ Unit ($) Revenue/ Unit ($) Setup Time/B atch (hour) Average Batch Size Production Time/ Unit (hour) Net Production Time/Unit (hour) Percentage Share of Units Sold A15548505.605.7610 B73061503.003.0425 C93981003.803.8820 D124910504.805.0010 E93661003.603.6620 F13485754.304.3715 Table 8-1

9 8-9Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Red Tomato Tools Weighted average approach Material cost per aggregate unit = 15 x 0.10 + 7 x 0.25 + 9 x 0.20 + 12 x 0.10 + 9 x 0.20 + 13 x 0.15 = $10 Similarly Revenue per aggregate unit = $40 Net production time per aggregate unit = 4.00 hours

10 8-10Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Aggregate Planning Strategies Trade-off between capacity, inventory, backlog/lost sales Chase strategy – using capacity as the lever Time flexibility from workforce or capacity strategy – using utilization as the lever Level strategy – using inventory as the lever Tailored or hybrid strategy – a combination of strategies

11 8-11Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Chase Strategy Vary machine capacity or hire and lay off workers as demand varies Often difficult to vary capacity and workforce on short notice Expensive if cost of varying capacity is high Negative effect on workforce morale Results in low levels of inventory Used when inventory holding costs are high and costs of changing capacity are low

12 8-12Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Time Flexibility Strategy Use excess machine capacity Workforce stable, number of hours worked varies Use overtime or a flexible work schedule Flexible workforce, avoids morale problems Low levels of inventory, lower utilization Used when inventory holding costs are high and capacity is relatively inexpensive

13 8-13Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Level Strategy Stable machine capacity and workforce levels, constant output rate Inventory levels fluctuate over time Inventories carried over from high to low demand periods Better for worker morale Large inventories and backlogs may accumulate Used when inventory holding and backlog costs are relatively low

14 8-14Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Aggregate Planning Using Linear Programming Red Tomato Tools –Highly seasonal demand –Develop a forecast MonthDemand Forecast January1,600 February3,000 March3,200 April3,800 May2,200 June2,200 Table 8-2

15 8-15Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Red tomato tools The options Product is sold through the retailer 40$ /unit The starting inventory in Jan is 1000 units The company has 80 employees, and each employee earns 4 $/hour regular. The total working days per month 20. The capacity of the plant is determined by the total labor hours worked. Currently no limit on inventory, subcontracting and stock out / backlogs. All stock out are backlogged and supplied from the following month production inventory. The supply chain manager goal is to obtain the optimal aggregate plan that allows RT to end June with at least 500 units.

16 8-16Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Red Tomato Tools ItemCost Material cost$10/unit Inventory holding cost$2/unit/month Marginal cost of stockout/backlog$5/unit/month Hiring and training costs$300/worker Layoff cost$500/worker Labor hours required4/unit Regular time cost$4/hour Overtime cost$6/hour Cost of subcontracting$30/unit Table 8-3

17 8-17Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Red Tomato Tools Decision Variables For t = 1,..., 6 W t =Workforce size for month t H t =Number of employees hired at the beginning of month t L t =Number of employees laid off at the beginning of month t P t =Production in month t I t =Inventory at the end of month t S t =Number of units stocked out at the end of month t C t =Number of units subcontracted for month t O t =Number of overtime hours worked in month t

18 8-18Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Red Tomato Tools Objective Function Minimize (Regular-time labor cost + Overtime labor cost + Cost of hiring and layoffs + Cost of holding inventory + Cost of stocking out + Cost of subcontracting + Material cost)

19 8-19Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Red Tomato Tools Constraints 1.Workforce, hiring, and layoff constraints All for t = 1,..., 6 2.Capacity constraints 3.Inventory balance constraints 4.Overtime limit constraints

20 8-20Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Red Tomato Tools Average time in inventory

21 8-21Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Red Tomato Tools Total cost over planning horizon = $422,275 Revenue over planning horizon = 40 x 16,000 = $640,000 Period, t No. Hired, H t No. Laid Off, L t Workforce Size, W t Overtime, O t Inventory, I t Stockout, S t Subcontract, C t Total Production, P t 0008001,00000 10156401,960002,560 2006401,520002,560 300640880002,560 40064002201402,560 500640140002,560 600640500002,560 Table 8-4

22 8-22Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Red Tomato Tools Average seasonal inventory

23 8-23Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Red Tomato Tools Higher demand variability MonthDemand Forecast January1,000 February3,000 March3,800 April4,800 May2,000 June1,400 Table 8-5 Average seasonal inventory

24 8-24Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.

25 8-25Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Red Tomato Tools Total cost over planning horizon = $432,858 Period, t No. Hired, H t No. Laid Off, L t Workforce Size, W t Overtime, O t Inventory, I t Stockout, S t Subcontract, C t Total Production, P t 0008001,00000 10166402,56000 2006402,120002,560 30064088001402,560 40064001,22002,560 500640066002,560 600640500002,560 Table 8-6


Download ppt "PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e 1-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall."