Download presentation
Presentation is loading. Please wait.
1
Wireless Data Technologies
MM Clements
2
Last Week WiMAX has LOS and NLOS Backhaul will be p-to-p and LOS
NLOS suffers from flutter but can be solved with smart base stations WiMAX may replace last mile to subscribers May not eclipse x for some time Customers may get up to 15 Mbps from access points, MWT
3
This week………. Telabria Case Study
Steps needed to deploy a WiMAX network MWT
4
Telabria Local company Providing wireless backhaul in Kent
2nd year of trading Working with local government Using 5.8 GHz for local access Neither LOS nor NLOS – gives good multipath propagation MWT
5
Offered Products Home 1.5 & 3 Mbps down, 512 kbps up
Commercial offerings 5 and 10 Mbps VoIP offered too Free WiFI hotspot access for customers Other benefits – see text for lecture MWT
6
Network Infrastructure
MWT
7
Two Tiered Network Backhaul – LOS microwave High power - licensed
Local Service – 5.8 GHz 5.8 GHz is unlicensed Others may use this frequency Low power only allowed MWT
8
State of Network, 2005 MWT
9
State of Network 2007 MWT
10
Network Backhaul Currently expanding
Medway came online 1st quarter 2006 Herne Bay, Dover, Folkestone expected soon NOC in Sittingbourne MWT
11
Local Government Partnership
Working with councils Giving free services Gaining rooftop access Essential for WiMAX service Cuts leasing costs Over 100 roofs in Chatham MWT
12
Setting up Network Financial Planning Models – Wholly company owned
Customers must be available Partnership City or town owned Financial opportunities essential for viability MWT
13
Inventories The current and proposed fixed connectivity options offered by local providers Current and future frequencies that are/ will be available An inventory of assets such as buildings, towers etc. to set up the wireless hardware MWT
14
Proposed use of Network
Defines BW requirements Fixed connectivity VoIP services Mobile data services Video surveillance Etc. MWT
15
5 Year Financial Plan Defines customer take-up
Includes costs of setup and maintenance and training etc. Hidden savings e.g. from surveillance to be factored in MWT
16
Site Survey Spectral analysis Tower documentation and mapping
LOS test – id in doubt, set up test rig Power, space requirements, cable runs etc. MWT
17
Network Design Summary of objectives, goals, expectations, advantages, challenges, frequencies etc. Blueprint of required hardware & vendors Complete costing Power budget Site survey results – tower dimensions etc. Coverage maps MWT
18
Site Planning and Construction
Site owner must agree to plans Permission for structure from local authority Site walk to view actual site Spectrum licence from Ofcom Staging – buying and setting up hardware Installation of switches, cabling Rigging – set up of dish Testing MWT
19
Monitoring of Devices Check devices work
Set up baselines for performance Threshold traps of 25% set up Alarms call NOC and key staff if SLA at risk Network collisions & data loss should be monitored MWT
20
Device Maintenance Remote reset or configuration may work
Otherwise truck roll required Firmware updates Visual inspection every 6 months Staff should be able to log in serially or by Ethernet Plans for access 24/7 must be available MWT
21
Conclusion Telabria are expanding rapidly – taken over late 2006
Each new area needs to be treated differently Planning Site survey Network Design Site Planning Construction Maintenance MWT
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.