Presentation is loading. Please wait.

Presentation is loading. Please wait.

COMMUNICATION INFOTECH. MICROWAVE INSTALLATION Check on the power outlet box before beginning the installation to insure that outlet box is properly grounded.

Similar presentations


Presentation on theme: "COMMUNICATION INFOTECH. MICROWAVE INSTALLATION Check on the power outlet box before beginning the installation to insure that outlet box is properly grounded."— Presentation transcript:

1 COMMUNICATION INFOTECH

2 MICROWAVE INSTALLATION Check on the power outlet box before beginning the installation to insure that outlet box is properly grounded.

3 TOOLS REQUIRED FOR INSTALLATION o PENCIL o TAPE MEASURE & STRAIGHT EDGE o CUTTING DAMPER o CUT THE TAMPLATE o ELECTRIC DRIL WITH 3/16, ½, & 5/8 DRIL BITS o FILLER BLOCKS o GLOVES o SAW o HAMMER o SAFETY GOGGLES o DUCT & MASKING TAPE

4 INSTALLATION OF MICROWAVE Varry that space between the cabinets is 30 cm wide & free the obstruction. 1 st step determining the size of location where the mw will be mounted, mark the pencil. The most difficult part as the installation process electrical or vent work that may be required, depending on the type of microwave.

5 Scope of Work Receipt the site information from customer will TND Material reception at the sides & checking as per packing list. Hosting of GSM/CDMA antennas on tower as per TND. Routing of RF cable from the shelter to Anteena Grounding the Anteena & RF cables at appropriate place. Installation of Indor JUPers Switching equipment Power measurement

6 OUTDOOR Fixining of horizontal cable array Fixing of RF antenna & microwave antenna Clamping & routing of cables Grounding Allignment of antenna as per specification

7 INDOOR Installation of radio base station(RBS) Installation of TRx rack Installation & commissioning & Tx equipment Fixing of cable array Grounding equipment

8 INSTALLATION INSTRUCTION FOR MICROWAVE(MW) PARABOLIC ANTEENA 2.4M (8ft) Reflector 2.8 m Wave guide feed signal or dual polarized Pipe mount for installation on pipe 115mm Antena offset to the left or the right Safety collar for easy installation 2 spindles for fine adjustment of azimuth & elevation of +5deg & -5deg

9 One sway bare Reflector with shroud, shroud aperture covered by high performance

10 TOOLS REQUIRED FOR INSTALLATION Hoisting device for 4000N Shackl 2 ropes Water balance & compass


Download ppt "COMMUNICATION INFOTECH. MICROWAVE INSTALLATION Check on the power outlet box before beginning the installation to insure that outlet box is properly grounded."

Similar presentations


Ads by Google