1 STAR ONE C1 - Insurance Presentation
6- Satellite Reliability analysis

2 Satellite Reliability Analysis
Satellite Reliability & Availability Analysis : STR1-ASPI-AN-0195 Reliability requirements : For Ku-band payload, the reliability shall be at least 0.70, For C-band mission, the reliability shall be at least 0.60, For X-band payload, the reliability shall be at least 0.80, taking into account the effect of the platform reliability, at the end of its Operational Lifetime, with failure rates in accordance with the Product Assurance Requirements.

3 Satellite Reliability Analysis
Reliability estimates meet the objectives for the three missions :

4 Satellite Reliability Analysis

5 STAR ONE C1 - Insurance Presentation
7 - Single Point Failure & Qualification Status Lists

6 Single Point Failure (SPF)
Star One C1 Satellite SPFs of criticality 1 (total loss of mission) are identical to other Spacebus 3000 Satellites SPFs Most of the SPFs can be grouped in 3 categories : Items used during Solar Array deployment with risk of failure to release. Mitigation : lot testing of pyro devices and safety margins Propulsion items with risk of burst or leakage Mitigation : proof test at unit level and/or global leak test at Maximum Expected Operating Pressure (MEOP) after Satellite environmental sequence Structural items with risk of mechanical failure Mitigation : safety margins Detailed SPFs list is provided in the following slide. Note : grey items (SPFs) exist only for Launch and Early Orbit Phase (LEOP).

7 Single Point Failure List

8 Qualification Status List

9 Qualification Status List

10 Qualification Status List

11 Qualification Status List

12 Qualification Status List

13 Qualification Status List

14 Qualification Status List

15 Qualification Status List

16 Qualification Status List

17 Qualification Status List

18 Qualification Status List

19 Qualification Status List

20 Qualification Status List
(X) : Not an equipment

21 Qualification Status List
(X) : Not an equipment

22 Qualification Status List
(X) : Not an equipment

23 Qualification Status List
(X) : Not an equipment