1 Implementing an Adaptive Capital Improvement Program
NC AWWA-WEA 95th Annual Conference Implementing an Adaptive Capital Improvement Program Katy Weidner, Black & Veatch

2 Acknowledgements Co-Authors Courtney Driver, City of Winston Salem
Kevin Laptos, Black & Veatch Kent Lackey, Black & Veatch

3 Agenda Adaptive Capital Planning Winston-Salem’s Adaptive CIP
Overview of the Master Plan Goals for Developing the iCIP Tool How the iCIP Tool Works

4 Adaptive capital planning

5 Adaptive Capital Planning
Focus on Asset Management & Optimization rather than Expansion Need for cost-effective assessments Address worst condition assets first Risk based prioritization Planning for Growth alongside of Budgeting for Maintenance

6 CIP Prioritization - Old approach
Traditional CIP Static CIP Report Time and situation constrained Not risk-based Not adaptable Adaptive Capital planning

7 Factors that can affect Planning
Growth Rates Asset Condition Outside Factors Pictures for final presentation? Maybe cycle through

8 Winston-Salem’s Wastewater System Master Plan

9 City/County Utilities Commission – Collection System Overview
1,724 miles of sewer main 49 Pump Stations Two Treatment Plants Muddy Creek (21 MGD) Elledge (30 MGD) Three Major Sewer Basins 9

10 Wastewater System Master Plan
Evaluate collection system capacity in three major basins Prioritize Capacity improvements 30 year Master Plan (2011 – 2041) Future Treatment Alternatives Evaluation Collection System Asset Evaluation Wastewater System Evaluation Capacity Driven Projects Condition Driven Projects CIP Projects 10

11 Developing the cip Projects
Capacity Driven Projects Flow Projections Field Surveys and Flow Monitoring Hydraulic Model for Base and future Years Condition Driven Projects Facility Inspections Pipeline Prioritization Criticality Ratings based on consequence of failure Condition Scores evaluated based on available data, modeling results, and age of pipe

12 Asset Management approach to system planning
Provides a comprehensive and coordinated Master Plan CIP

13 …But How final is the “final” CIP?
What if… A routine pipeline inspection reveals a pipe failure at the location of a future capacity project? OR A 2020 DOT project includes tearing up and repaving the road at a sewer crossing in the 2030 CIP. Does it make sense to move forward the project? All of the project or maybe just the road crossing? We need to compare alternatives and update the CIP!

14 Adapting the cip using the iCIP tool

15 Customizing iCIP for Winston-Salem
Evaluating Current Needs Critical Capacity Driven Projects Long-Term and Short-Term Budgeting Tools Increased functionality for Cost Estimating, Project Scheduling, and Cash Flow and Spend Plans Data Collection Plan Evaluating Future Needs Asset Condition Database Prioritize Inspection and R&R budgets 15

16 Adaptive approach to CIP Prioritization
Three Components Asset Prioritization – Leverage GIS Inventory and updated condition data to prioritize projects (GIS) Asset Costing – Dynamic update costs based on project changes to scope and schedule (Excel) CIP project identification (iCIP)

17 Adaptive CIP Integrate the CIP spreadsheet with the iCIP GIS Inventory
26 April 2017 Adaptive CIP Integrate the CIP spreadsheet with the iCIP GIS Inventory 17 Black & Veatch

18 iCIP - GIS interactive Capital Improvement Planning
Built on top of ArcGIS (Esri Add-in) Open architecture, Esri-based enhanced by B&V Integrate CIP with existing GIS Inventory Risk and Capacity Based Prioritization iCIP Cost estimating tool Elevate awareness with graphic displays Risk- and capacity-based prioritization Integrate with existing GIS asset inventory Geographic interface Adapt to changing budgets and priorities Dynamic budgeting and reporting 18 18

19 How iCIP works for Winston - Salem

20 Project Summary Window

21 Assets Window

22 Project Details Window

23 CIP Excel spreadsheet Summarizes Scope and Performance Triggers
26 April 2017 CIP Excel spreadsheet Summarizes Scope and Performance Triggers Calculates detailed Cost Opinions Project Phasing, Cash Flow and Encumbrance iCIP Tools in excel Black & Veatch

24 Hidden Cells contain the data used for cost estimates
24 Hidden Cells contain the data used for cost estimates

25 Unit Cost Assumptions Linked to Detailed Costs for easy updating 25
Diameter Material Installation Material cost Total Unit cost MH 6 DIP (Force Main) 35 26 61 2000 8 EVCP 80 38 118 3000 10 100 45 145 12 150 47 197 4000 15 53 203 6000 16 200 57 257 18 64 264 21 72 272 24 83 283 8000 27 Flowtite GRP SN46 250 125 375 30 128 378 36 155 405 12000 42 176 426 48 300 198 498 54 224 524 15000 60 557 66 286 586 323 623 25 Linked to Detailed Costs for easy updating

26 Phasing is Based on the Start Year and Project Duration
26

27 Adjusting cash flow

28 Adaptive CIP An Adaptive CIP can…
Leverage risk-based prioritization and/or capacity assessments Immediately see results of decisions graphically Easily integrate with existing and updated GIS asset inventory Provide tools to adapt to changing budgets, asset conditions and priorities 28

29 In closing… An Adaptive CIP can respond to…
Growth – Whether a recession slows growth or a housing boom in an unforeseen area accelerates growth, CIP projects can “slide” to when they are needed. Condition – Prioritization scores can be continually updated and used to allocate resources efficiently Outside Factors – Updates can be made to take advantage of developer projects, transportation projects, etc 29

30 Thank you for attending this presentation!
any questions? ? Thank you for attending this presentation! 30