EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE BANGALORE.

Similar presentations


Presentation on theme: "EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE BANGALORE."— Presentation transcript:

1 EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE BANGALORE

2 ULTRA MEGA THERMAL POWER PROJECTS  GUJARATMUNDRA PORT  MADHYA PRADESHASSAN  CHATTISGARHAKALTARA  KARNATAKA KARWAR  MAHARASHTRAKONKAN COAST  4000 MW EACH  RS 15000 CRORES INVESTMENT FOR EACH PLANT  77 EXPRESSIONS OF INTEREST RECEIVED BY PFC

3 KARWAR ULTRA MEGA THERMAL POWER PROJECT EVACUATION CHALLENGES  ENVIRONMENTAL ISSUES  KARWAR IS IN COASTAL SURROUNDED BY DENSE FORESTS –FOREST CLEARANCE APPROVALS – LONGER LEAD TIMES –NECESSITATES QUICK FINANCIAL TIE- UPS AND STATUTORY APPROVALS –MAY REQUIRE USE OF MULTI CIRCUIT TOWERS TO CONSERVE ROW

4 KARWAR ULTRA MEGA THERMAL POWER PROJECT EVACUATION CHALLENGES  TECHNICAL ISSUES  LOAD-LOAD GROWTH IN NORTH COASTAL KARNATAKA NOT COMMENSURATE WITH THE GENERATION ADDITION.  LOAD CENTRES ARE TOWARDS SOUTH – BANGALORE-MYSORE-MANGALORE- HASSAN.  BANGALORE LOADS GROWING AT A PHENOMENAL RATE (15%).

5 EVACUATION STRATEGIES CORE ISSUES  EVACUATION FOR A 4000 MW STATION NEEDS TO BE ROBUST  LOAD CENTRES ARE FAR AWAY NECESSIATING A NEED FOR LONG LINES  HOLISTIC PLANNING:-SHOULD BLEND IN WITH THE EXISTING SCHEME FOR ECONOMY AND BETTER CORRIDOR UTILIZATION  VOLTAGE LEVELS:- –765 KV LINES

6 Sugested Evacuation Plan for KARWAR ULTRA MPP 4000MW GOOTY SSLM NSR HYD KURNOOL HIRIYUR NARENDRA KAIGA NAGARJUNA 1000 MW TALAGUPPA KARWAR ULTRA MPP (4000 MW) ANANTPUR (AP) MAPUSA (GOA) HVDC B2B@ MAPUSA TO PARLE (WR) DODBALLAPUR TO KOLAR MUNIRABAD TORANGALLU RAICHUR TO KOHZIKODE (KERALA) GUTTUR AC Link or HVDC B2B at RAICHUR or PARLE HASSAN MYSORE HOODY NELAMANGALA SMNHL Lines considered in CEA NEP 2012 Lines in service by end Dec 06 Suggested KARWAR Evacuation and NAGARJUNA Mangalore Project Evaluation Fixed Series Compensation BIDADI

7 Suggested Evacuation Lines Karwar-Mapusa ( HVDC B2B link) Karwar-Talaguppa (400 kv double ckt.) Karwar-Hiriyur (400 kv double ckt.) Hiriyur-Hassan (400 kv double ckt.) Nelamanga-Talaguppa both ckts. LILO at Hassan Nagarjuna – Hassan (400 kv double ckt.) Hassan-Mysore (400 kv double ckt.) Mysore-Nelamangala one ckt. LILO at Bidadi.