Presentation is loading. Please wait.

Presentation is loading. Please wait.

The Manufacturing PlantSimLern ® © 2007 Frank D. GeislerVersion 2.3, Page 1 SimLern ® Frank D. GeislerMobile: +41-76-343-0223 Alte Toesstalstrasse 50Fax:

Similar presentations


Presentation on theme: "The Manufacturing PlantSimLern ® © 2007 Frank D. GeislerVersion 2.3, Page 1 SimLern ® Frank D. GeislerMobile: +41-76-343-0223 Alte Toesstalstrasse 50Fax:"— Presentation transcript:

1 The Manufacturing PlantSimLern ® © 2007 Frank D. GeislerVersion 2.3, Page 1 SimLern ® Frank D. GeislerMobile: +41-76-343-0223 Alte Toesstalstrasse 50Fax: +41-52-394-0228 8487 Raemismuehle/Zell ZH Frank.Geisler@SimLern.chFrank.Geisler@SimLern.ch Switzerlandwww.SimLern.chwww.SimLern.ch

2 The Manufacturing PlantSimLern ® © 2007 Frank D. GeislerVersion 2.3, Page 2 The Manufacturing Plant Business Game and Simulation, that demonstrate the impact Maintenance has on World Class Performance

3 The Manufacturing PlantSimLern ® © 2007 Frank D. GeislerVersion 2.3, Page 3 Board

4 The Manufacturing PlantSimLern ® © 2007 Frank D. GeislerVersion 2.3, Page 4 What do we impart? How professional Maintenance Management includes maintenance, production, purchasing and finance How Cooperation and Coordination are needed to accomplish the maintenance function How Process Optimization and Business Economics are interlinked How Equipment Availability is affected by different maintenance strategies How increased equipment availablity translates into greater Profitability

5 The Manufacturing PlantSimLern ® © 2007 Frank D. GeislerVersion 2.3, Page 5 The Pyramid of Benefits Maintenance, Production, Purchasing, Finance Breakdown/Proactive Maintenance Procurement/Spare Parts Inventory Maintenance Systems (CMMS) Equipment Availability (OEE) World Class Performance

6 The Manufacturing PlantSimLern ® © 2007 Frank D. GeislerVersion 2.3, Page 6 Targets Higher Profits Allure and sensitize staff members for complex measures such as 5S, JIT, Kaizen, CIP, Lean Management, Six Sigma, SMED, TPM or TPS Increase Holistic Thinking of employees Foster Communication and Team Spirit


Download ppt "The Manufacturing PlantSimLern ® © 2007 Frank D. GeislerVersion 2.3, Page 1 SimLern ® Frank D. GeislerMobile: +41-76-343-0223 Alte Toesstalstrasse 50Fax:"

Similar presentations


Ads by Google