Inspecting the case of an unexpected Aircraft on Ground (AOG) condition.
2
AOG of Customer at Home Base (WAW) Suffer Very Few issues Home base well provisioned Spares GSE NDT Workshops Risks Operator Supplied Units (Logistics) Lead Times Oversize/DG Shipments Customs Manpower Availability OEM response times – Engineering Requests
3
AOG of Customer at Remote Base What can cause Risk and Delay? FactorsRisksMitigation Travel Visas Environmental/Health/Safety Accommodation Flight Availability Dedicated AOG Engineers AOG Protocol Composition of Team/GSE Improper diagnosis of Defect Live monitoring of Defect (AHM) Establish MRO Partners in Advance Flying Spanner Documentation Needs Connectivity Issues Updated/Controlled USB data Sets Material (GSE/Parts) Availability Oversize Customs DG 24/7 Logistics Team Contracts with Multiple Shippers Operator Engagement Aircraft Charter
4
AOG of Customer at Remote Base How we can mitigate challenges when crew exceed time Send Adequate Resource Correct Identification of work to be done Plan to work 2 shifts Use local MRO assistance where possible Re-assessment of job in hand as soon as first team arrive Exploring Challenges when there is a need for new equipment for engine maintenance and how we can prepare for unexpected AOG. Expanding LOTAMS Inventory Continuing Investment New PART-145 Approvals Manufacturer/ Partner MRO Support Focus on more portable tooling
5