26 March 2007LEADE/ D. Swoboda1 LDX implementation Progress on action items Progress on installation New topics
2
26 March 2007LEADE/ D. Swoboda2 BIS beam interlock system Requirements : Cable length between CIBU and double current loop generation shall not exceed 4 m for electrical signal integrity reason. Experiments to define exact location of CIBU. Experiments to assure that interlock signal integrity at arrival on the CIBU is guaranteed. The requirements are specified in [1] Chapter 5. The cable length between patch-panel and the associated CIBU must be given to AB/CO to check the electrical compatibility for the cables from BIC to CIBU. CIBU needs to be connected to safe power source. Actions : B. Puccio will supply proposal for procedure of periodic IL chain tests. CIBU implementation : One patch-panel which is installed by AB/CO in the dedicated rack is foreseen between the CIBU and the BIC crate) ATLAS: all CIBUs (ATLAS, movable devices, magnet,) will be installed in rack Y4.02-03.A1 which is equipped with UPS. Electronics to be installed in rack next to it. No patch-panels required. LHCf: CIBU will be installed in USA15 rack Y.26-05.A1. Patch-panel required in Y4.02-03.A1. ALICE: CIBU ALICE will be installed in rack UX25/C28. Patch-panels required for Magnet, ALICE ZDC. CMS: all CIBUs will not be directly cabled but the connection from BIC will be terminated in patch- panels. The cabling between patch-panel and CIBU will be executed by CMS/Totem following the prescription from AB-CO. LHCb: all CIBUs will not be directly cabled but the connection from BIC will be terminated in patch-panels. The cabling between patch-panel and CIBU will be executed by LHCb following the prescription from AB-CO.
3
26 March 2007LEADE/ D. Swoboda3 BIS cabling in Experiments
4
26 March 2007LEADE/ D. Swoboda4 TTC InstrumentationEqmt. LHC side Eqmt. EXP Side Application LHC side Application EXP Side cabling - Rx/Tx-modules (A & D) validated by AB/RF [1] [1] AB/RF procurement Prod. Apr07 RF2TTC proto- module under test (Dec 06) Prod. Feb07 ~ 90 D links ~ 10 A links RF2TTC proto ≥ Beg07 Fanout avail. C library now dvpmt 1Q07 Charge of EXP C library now dvpmt requested fibres installed except SR4, reserved by TS/EL team patch ≥ Beg07 [1] [1] http://ttc-upgrade.web.cern.ch/ttc- upgrade/New_system/TTCupgrade_System_Test_report.pdf http://ttc-upgrade.web.cern.ch/ttc- upgrade/New_system/TTCupgrade_System_Test_report.pdf The acceptance tests of the digital Tx and Rx were done in collaboration with AB/RF end of November 2006 Production quantities RF2TTC end of May, Fanout end of May, Tx and Rx probably in July (these ones are in hands of AB/RF)
5
26 March 2007LEADE/ D. Swoboda5 BST InstrumentationEqmt. LHC side Eqmt. EXP Side Application LHC side Application EXP Side cabling In productionPt 1,5 1st Q07 Pt 2,8 2 nd Q07 DIP done
6
26 March 2007LEADE/ D. Swoboda6 GMT InstrumentationEqmt. LHC side Eqmt. EXP Side Applicatio n LHC side Application EXP Side cabling AvailableVME (CRTV)availableTTL trigger signals Under way available configurations( Supply includes CTR card, Driver, Diagnosis S/W) Platform/OSLynxOSLinux PCCTR: PCI/PMC CES Power PC ( VME)CTR: PMC/VMENot available 1.GMT specific parameters UTC time stamp (25 nsec resolution, < 1μsec accuracy) Safe beam parameters Beam mode 2.maintenance issues version maintenance (driver down load) – responsibility of AB-CO, 24 h piquet support only available for full AB-CO systems.
7
26 March 2007LEADE/ D. Swoboda7 BPTX InstrumentationEqmt. LHC side Eqmt. EXP Side Application LHC side Application EXP Side cabling AvailablePt1_L installed Pt1_R pending Pt2 pending Pt5_L installed Pt5_R pending Pt8 installed Pt8 ok Pt1 L ok follows LHC installation noneAnalog signal BPIM [2] [2] Pt1_L ok Pt1_R pending Pt2 pending Pt5_L ok Pt5_R pending Pt8 ok [2] [2] Proposal for a Beam Phase and Intensity Monitor (LHCb 2006- 055)
8
26 March 2007LEADE/ D. Swoboda8 BIC InstrumentationEqmt. LHC side Eqmt. EXP Side Application LHC side Application EXP Side cabling 1 st H 07 CIBU avail. for test Mar07 Charge of EXP Under way 1 st H 07 Under way CIBU delivery to experiments expected now. LHC interlock system test provisionally planned for summer. If beam permit flag generation not yet operational experiment need to simulate the signal to be sent to the CIBU. Test requires 2 signals to be changed independently.
9
26 March 2007LEADE/ D. Swoboda9 cable end point in experiments SystemALICEATLASCMSLHCbTotemLHCf TTCSR2 (2275) - UX25/C26/36/6 (5+3) 4Y.03-02.A1 (5+2) USC55 (3524) S1E03 (5+2) [1] [1] UX85/3B09 Sharing CMS Sharing ATLAS BSTSR2 (2275) (2) UX25/C26/36/6 (2) 4Y.03-02.A1 (2*BOBR) USC55 (3524) S1E03 (4) [2] [2] UX85/3B09 Sharing CMS Sharing ATLAS GMTC28/35 - DCS4Y.03- 02.A1(CTRV) ???(CTRP) Y.15-02A1 for R. Spiwoks USC55 (3524) S2B16 (CTRI) UX85/3B09 ???Sharing ATLAS BPTXUX25/C28 (4x)4Y.03-02.A1 (4 x) USC55 (3524) S1E08 (4x) UX85/3B09 ???Sharing ATLAS BISUX25/C284Y.03-02.A1 USC55 (3524) S1E08 UX85/3B09 USC55 (3524) S1E08 USA15/Y.26 -05.A1 or Y.27-05.A1 MCS/ MSS UX25/C284Y.03-02.A1 USC55 (3524) rack tbd (1 CIBU) – Magnet [3] [3] UX85/3B09 na CMS General Comment Optical fibres (TTC, BST) installed by TS-EL-OF generally require a patch panel to terminate them. This cannot go in S1E03, but could find place in S1E09? The installation of these same fibres have been requested of TS-EL-OF by Sophie Baron (PH/ESS). [1] [1] TTC Fibres for CMS go directly via the Machine Tunnel from Point 4 to Point 5, they do not pass the CCC/R as for the others [2] [2] BST Fibres are two per ring [3] [3] Original arrangement between B. Puccio (AB/CO) and E. Sbrissa (PH/DT1) was that E. Sbrissa would install the correct cable between the BIC and his CIBU. E. Sbrissa is ok with someone doing it for him, however, and will supply the final rack location ASAP.
10
26 March 2007LEADE/ D. Swoboda10 data exchange H/W in experiments SystemALICEATLASCMSLHCbTotemLHCf TTC4Y.03-02.A1 (5+2) Sharing ATLAS BST4Y.03-02.A1 (2*BOBR) 2x fanout ODIN Sharing ATLAS GMT [1] [1] 1U pp/12lemo 4Y.03-02.A1 1U pp/12lemo 1 VME/CTRV ???(CTRP) 1U pp/12lemo 1 VME/CTRV Sharing ATLAS BPTX4Y.03-02.A1 (4 x) connectors 1N50PMD BPIM [2] /3B0 9 [2] Sharing ATLAS BRANDIP BISUX25/C28 (1 pp) 1+1 CIBU 4Y.03-02.A1 2+1 CIBU USC55 (3524) S1E08 (1 pp) 1CIBU UX85/3B09 (2 pp) 2 CIBU USC55 (3524) S1E08 (1 CIBU) – XP S1E08 (1 CIBU) – Beam1 S1E08 (1 CIBU) – Beam2 USA15/Y.26 -05.A1 or Y.27-05.A1 (1pp) 1 CIBU MCS/MSSUX25/C28 (1 pp) 1 CIBU 4Y.03-02.A1 1 CIBU USC55 (3524) (1 pp) 1CIBU UX85/3B09 (1 pp) 1 CIBU na [1] [1] Termination through 1U pp with 12 Lemo or Canon 9p. [2] [2] Proposal for a Beam Phase and Intensity Monitor (LHCb 2006-055)
11
26 March 2007LEADE/ D. Swoboda11 cost of data exchange systems for experiments SystemEqmt. LHC sideEqmt. XP SideAppl. XP Sidecabling TTCfoC Di: 1.3 kCHF/ch An: 8.5 kCHF/ch [1] [1] NNfoC except: Splitting & conx. BSTIn TTC NNfoC except: Splitting & conx. GMTfoCxx kCHF (VME fully equipped) < 1kCHF CTR PCB On requestfoC in surface bldg. Cu cable to XP rack BPTXfoCnaNNfoC BRANfoC NNfoC BISfoC NNBIC to pp/CIBU = foC MCS/MSSfoC BIC to pp/CIBU = foC [1] [1] Computed prices including the price of the transmitters from SR4 to experiments
12
26 March 2007LEADE/ D. Swoboda12 Cabling schedule [1] [1] Cable type CMC50 replaced by CMA50. SystemALICEATLASCMSLHCbTotem TTC Ok/splitting pending Ok Ok/splitting pending Sharing CMS BST Ok/splitting pending Ok Ok/splitting pending Sharing CMS GMT 11/06 -> 03/07 Y.15-02A1 pour Ralph Spiwoks ok ≥03/07 10/06 -> 12/06 ??? BPTX [1] [1] 11/06 -> 03/07 Ok 10/06 ok ??? BRAN na BIS 11/06 -> 03/07 Tbd -> 03/07 10/06 -> 12/06 03/07 MCS/MSS 11/06 03/07 10/06 na Cable test 04/07 01/07
13
26 March 2007LEADE/ D. Swoboda13 Update (JC Guillaume 20/03/07) AreaCabling Status Point 11) Câblage BPTX: Terminé. 2) Câblage Timing et BIC: Câbles tirés, raccordements et tests en cours. / En principe, fini fin mars. Point 21) Câblage ZDC détecteurs câbles CK50: UA27: Tirage terminé.Connectique à faire / finie fin avril UA23: Tirage en cours. Connectique à faire / finie fin avril 2) Câblage ZDC Alice: UA27: Tirage terminé. Connectique à faire / finie mi-avril. UA23: Tirage en cours. Connectique à faire / Finie fin avril. 3) Câblage BPTX: UA27: Tirage terminé. Connectique à faire. / finie fin avril UA23: Tirage terminé. Connectique à faire. / finie fin avril. 4) Câblage timing et BIC: Câbles tirés; connectique à faire. / finie fin avril. Point 51) Câblage BPTX: Fait par TS-LEA 2) Câblage timing et BIC: Câbles tirés; connectique en cours. / finie fin avril. Point 81) Tous les câbles demandés ont été tirés et testés.
14
26 March 2007LEADE/ D. Swoboda14 Low β triplet WPS
15
26 March 2007LEADE/ D. Swoboda15 Low β triplet monitoring
16
26 March 2007LEADE/ D. Swoboda16 Low β triplet monitoring detail
17
26 March 2007LEADE/ D. Swoboda17 Contact persons LHC: Rudiger.Schmidt@cern.chRudiger.Schmidt@cern.ch BIS/SLP: Bruno.Puccio@cern.chBruno.Puccio@cern.ch GMT: Javier.Serrano@cern.chJavier.Serrano@cern.ch TTC: Sophie.Baron@cern.chSophie.Baron@cern.ch BST: Rhodri.Jones@cern.chRhodri.Jones@cern.ch BPTX: Rhodri.Jones@cern.chRhodri.Jones@cern.ch BRAN: enrico.bravin@cern.chenrico.bravin@cern.ch DIP: Wayne.Salter@cern.chWayne.Salter@cern.ch Timber: Ronny.Billen@cern.chRonny.Billen@cern.ch Cables: Jean-Claude.Guillaume@cern.chJean-Claude.Guillaume@cern.ch Luit.Koert.de.Jonge@cern.ch ALICE: Detlef.Swoboda@cern.chDetlef.Swoboda@cern.ch ATLAS: thilo.pauly@cern.chthilo.pauly@cern.ch CMS: jan.troska@cern.chjan.troska@cern.ch LHCb: Richard.Jacobsson@cern.chRichard.Jacobsson@cern.ch Totem: Walter.Snoeys@cern.chWalter.Snoeys@cern.ch
18
26 March 2007LEADE/ D. Swoboda18 LHC exchange Action Items Each Experiment to determine what is missing Agree with suppliers to get commitment on scope and time Organize missing issues
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.