Download presentation
Presentation is loading. Please wait.
Published byBernadette Jennings Modified over 8 years ago
1
EURASIARAIL FAIR 02-05 MARCH 2011 ANKARA Rail Transit Construction Project Management BY GALIP SUKAYA
2
Project Development Concept Political Support EIS Financing
3
Finance – Page I There are many Institutions Export Import Banks EBRD OPIC KfW EIB IFC Required Documentation Application Process
4
Finance – Page II Required Documentation Feasibility Report Financial Capability EIS/EIR Application Forms Application Process
5
Preparation of Contract Documents Design Criteria Conceptual Design 30%, 60%, 90%, 100% Design Specifications General and Special Conditions Estimate
6
Construction Management Scope Schedule Budget
7
Start Up Testing Safety Certification Revenue Service
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.