Download presentation
Presentation is loading. Please wait.
Published byJoan Lane Modified over 9 years ago
1
OPS Observations, Expectations, and Concerns Zach Barrett (OPS) Direct Assessment Workshop November 4, 2003
2
Observations Not Always Practical To Inline Inspect Small Diameter Lines Telescoping Lines (Storage Fields) Short Radius Bends Crossover Lines Adverse Flow Conditions
3
Observations Not Always Practical To Pressure Test Supply Concerns Water Availability and Disposal Internal Corrosion Concerns No Quantification of Future Corrosion Risk
4
The Landscape is Changing Individual Cathodic Protection and Coating Surveys Long History of Operator Use Evolving into “Direct Assessment” Formalized Process Integration of Data
5
The Landscape is Changing Pipeline Safety Improvement Act of 2002 Includes Provisions for Direct Assessment Pending Gas Integrity Management Rule Includes Direct Assessment
6
The Landscape is Changing NACE Developing DA Recommended Practices RP0502-2002 External Corrosion Final Internal Corrosion Dry/Wet Gas Stress Corrosion Cracking
7
OPS Concerns Validation of Direct Assessment Methodology Are Standards Appropriate Will Direct Assessment Identify Threats to Pipeline Integrity Repeatability of Process and Results
8
OPS Concerns Validation of Direct Assessment Methodology Establishment Excavation Criteria Reassessment Interval Justification
9
OPS Concerns Indirect Assessment Tool Limitations not well Defined (Probability of Detection) Important for Tool Selection Critical for Setting Reassessment Interval Needs Field Validation
10
OPS Expectations Validation through Direct Assessment Workgroup Demonstrations Validation through Direct Assessment Workgroup Demonstrations Standard Applicability Strengths and Limitations of the Methodology Improvements to Pipeline Integrity Resulting from Direct Assessment
11
OPS Concerns Consistency in Application of Assessments Critical for Repeatability of Results Successful Monitoring of Non-excavated Indications
12
OPS Expectations Development of Detailed Process and Documentation for: Development of Detailed Process and Documentation for: Direct Assessment Approach Staff & Contractor Qualifications Bases for Key Decisions & Criteria Employee & Contractor Roles
13
OPS Concerns Data Availability DA Requires Complete and Reliable Data Data Must Be Acquired Where Lacking May Result in Additional Direct Examinations
14
OPS Concerns Existence of Mature Data Management Processes Acquire, Store, Retrieve Data Quality - Verification Crucial to Effective Data Integration/Analysis
15
OPS Expectations Development of Effective Data Management System Processes and Procedures Key Data Collection, Storage, Retrieval Data Integration Data Quality/Control
16
OPS Concerns Proper NDT Methods for Direct Assessment Important for Effective Data Integration/Analysis Crucial for Identifying Proper Preventive or Mitigative Actions Key to Effective Reassessment Interval
17
OPS Expectations Development of Effective DA Process and Procedures Identifies Integrity Threat Conservative in Consideration of Full Range of Integrity Threats Provides Quality Data for Future Analysis
18
OPS Concerns Timeliness of Standard Development Key to Ensuring Quality and Consistency Developing for: ICDA – Wet/Dry Still Under Development SCCDA – Still Under Development
19
OPS Expectations Standard Development Should Follow ECDA Path for Evaluation/Validation Update Standards as Experience Demands Provide Detailed Guidance Where Appropriate
20
Successful Programs Establish Detailed Procedures for All Activities Establish Detailed Procedures for All Activities Data Collection/Management Feasibility Determinations Definition of Regions Indirect Inspection
21
Successful Programs Establish Detailed Procedures for All Activities Establish Detailed Procedures for All Activities Data Integration & Risk Analysis Direct Examination Post-Assessment
22
Successful Programs Procedures Address Procedures Address Responsibilities Task Identification How & When Task is Accomplished Communication of Task Results Records & Documentation
23
Successful Programs Demonstrate Effectiveness Aggressive Excavation Criteria Data Integration Comparisons with Excavation Findings Re-assessment Results
24
Successful Programs Documentation Identifies and Provides Justification for Assumptions Evidences Compliance with Gas IM Rule Provides Detailed Explanation When Standards not Followed Details are Important
25
Path Forward Continued Participation in DA Demonstration Projects Continued Support for Standards Development Improve from Lessons Learned
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.