Download presentation
Presentation is loading. Please wait.
Published byDominick Hodges Modified over 9 years ago
1
United States Navy San Clemente Island Wastewater Treatment Plant NPDES Permit Renewal Item #11
2
San Clemente Island (SCI) WWTP
3
SCI WWTP Shoreline
4
Permitting History Order No. 00-090 – Adopted June 29, 2000 ROWD application – December 21, 2004 Concerns regarding ASBS exception Not renewed at this time Installation of new WWTP in 2012 Updated ROWD application – August 22, 2012 Included tertiary and secondary treatment plants
5
Facility Design
6
New tertiary plant New discharge point New dilution ratio Added 3 effluent limits / removed 1 CEC special study Updated Requirements
7
SSO WDR does not apply Acute toxicity test unnecessary and expensive REC-1 does not apply Bacteria monitoring should be reduced Effluent limits based on BPJ should be removed US Navy Comments
8
Adopt the revised tentative permit Adopt the revised tentative permit with changes Do not adopt the revised tentative permit Options
9
Thank You
10
26 effluent limit exceedances: Copper - 2012 Zinc - 2012 Residual chlorine – 2009, 2010, 2011 Chronic toxicity – 2007, 2008, 2011 pH – 2008, 2009, 2011 10 reporting violations Compliance History
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.