Presentation is loading. Please wait.

Presentation is loading. Please wait.

The ATLAS Collaborative Tool Project A broad overview.

Similar presentations


Presentation on theme: "The ATLAS Collaborative Tool Project A broad overview."— Presentation transcript:

1 The ATLAS Collaborative Tool Project A broad overview

2 The ATLAS Collaboration Three thousand of my best friends IN2P3 Webinaire - 17 Nov 2011S. Goldfarb - ATLAS Collaborative Tools 2

3 IN2P3 Webinaire - 17 Nov 2011S. Goldfarb - ATLAS Collaborative Tools 3

4 IN2P3 Webinaire - 17 Nov 2011S. Goldfarb - ATLAS Collaborative Tools 4

5 Collaboration Composition IN2P3 Webinaire - 17 Nov 2011S. Goldfarb - ATLAS Collaborative Tools 5 ATLAS  3100 Members  1000 PhD Students  174 Institutions  38 Nations

6 Collaboration Activities IN2P3 Webinaire - 17 Nov 2011S. Goldfarb - ATLAS Collaborative Tools 6

7 Video Conferencing Current status of facilities & systems used by ATLAS IN2P3 Webinaire - 17 Nov 2011S. Goldfarb - ATLAS Collaborative Tools 7

8 Video Conference Facilities  Primary Facilities in Use  40-R-C10, 40-R-D10, 40-4-C01, 40-S2-C01, 40-S2-D01, 3150-R-001, 3162-2- C01, 3162-2-E01, 3162-1-K01, 304-1-007  Recently Installed  42-3-002, 40-4-D08  Still Awaiting Installation  42-R-001, 3150-R-003  Refurbishments  6 Facilities at end of maintenance contract in 2013  In Secretariat for Collaboration Use  Headsets, Phoenix Quattro Speaker-Phones, Laptop IN2P3 Webinaire - 17 Nov 2011S. Goldfarb - ATLAS Collaborative Tools 8

9 Audio & Video Conference Systems  EVO  http://evo.caltech.edu http://evo.caltech.edu  Or directly from Indico Agenda (Booking & Starting)  CERN MCU  H.323 : Connect to 98xxx@137.138.248.202 (xxx is random)  Phone : Call +41 22 76 70270 (enter 98xxx)  Or directly from Indico Agenda (Booking & Starting)  Alcatel My TeamWork  http://audioconf.cern.ch http://audioconf.cern.ch  Call +41 22 76 76000 (enter code) IN2P3 Webinaire - 17 Nov 2011S. Goldfarb - ATLAS Collaborative Tools 9

10 EVO Usage IN2P3 Webinaire - 17 Nov 2011S. Goldfarb - ATLAS Collaborative Tools 10 Growth ATLAS Meetings  Sep 2008: 300  Sep 2009: 500  Sep 2010: 1000  Sep 2011: 1500 We are the biggest user Cost ATLAS M&O (2011)  257 kCHF  Only the License

11 Vidyo Testing, Evaluation, Decision IN2P3 Webinaire - 17 Nov 2011S. Goldfarb - ATLAS Collaborative Tools 11

12 Vidyo Evaluation Timeline DateActivityResults Spring-Summer 2010Limited Testing by IT, Small MeetingsPotential Replacement, but limited Linux Support Fall-Winter 2010-2011Installation of Routers, Licenses for Large-Scale Tests New Clients for SLC5, Ubuntu need improvement Spring 2011Large-Scale and Production Tests by IT, ATLAS, CMS (and all together) Survey Results indicate general satisfaction with audio, video, interface, but need more Linux clients supported Summer 2011Survey Results, ATLAS & CMS Comments forwarded to IT FI launched market bid between EVO and Vidyo September 2011CERN Finance, IT select Vidyo, to be paid for from CERN funds LHC Experiments express need to keep EVO until communication with Vidyo is proven reliable. Experiments will pay. IN2P3 Webinaire - 17 Nov 2011S. Goldfarb - ATLAS Collaborative Tools 12 Vidyo Pilot Service: https://espace.cern.ch/vidyo-service/default.aspxhttps://espace.cern.ch/vidyo-service/default.aspx Vidyo Survey & Results : https://espace.cern.ch/vidyo-service/Lists/Pilot%20Feedback%20Formhttps://espace.cern.ch/vidyo-service/Lists/Pilot%20Feedback%20Form Vidyo FAQ : https://espace.cern.ch/vidyo-service/Lists/FAQ/AllItems.aspxhttps://espace.cern.ch/vidyo-service/Lists/FAQ/AllItems.aspx

13 ATLAS Comments onVidyo IN2P3 Webinaire - 17 Nov 2011S. Goldfarb - ATLAS Collaborative Tools 13

14 ATLAS Plans  Criteria  Video conferencing must remain available for collaboration  Support expected for all commonly used platforms  EVO will be supported until that is the case, but no longer  Migration Plans 1.Establish documentation for collaboration (see links at end) 2.Migrate Weekly Meeting, Closed EB, Physics Coordination 3.Migrate Open EB 4.Migrate Physics Plenaries Note : Each new step requires success of previous step IN2P3 Webinaire - 17 Nov 2011S. Goldfarb - ATLAS Collaborative Tools 14

15 Status, Notes  Status  Awaiting clear plan from IT  Issues to check:  CERN-Wide Registration System & Licenses  Infrastructure for Simultaneous EVO/Vidyo Usage  Will announce when plan is ready (expected soon)  Notes  This is NOT an evaluation. We will move to production mode, assuming all will work well. All problems MUST be reported.  You DO NOT need to change your equipment. IN2P3 Webinaire - 17 Nov 2011S. Goldfarb - ATLAS Collaborative Tools 15

16 Links IN2P3 Webinaire - 17 Nov 2011S. Goldfarb - ATLAS Collaborative Tools 16 ATLAS Documentation & Communication Collab Tool Servicehttp://cern.ch/atlas-collaborative-tools Meeting Supporthttp://cern.ch/atlas-collaborative-tools/meeting-support E-Groupatlas-collabtools@cern.ch CERN IT Documentation & Communication Vidyo Pilot Servicehttps://espace.cern.ch/vidyo-service/default.aspx Vidyo Quick Start Guide https://espace.cern.ch/vidyo- service/Shared%20Documents/CERNVidyoQuickGuide_v2.0.pdf Vidyo FAQhttps://espace.cern.ch/vidyo-service/Lists/FAQ/AllItems.aspx E-Groupvidyo-support@cern.ch Video Conference Services Vidyohttp://www.vidyo.com EVOhttp://evo.caltech.edu/evoGate


Download ppt "The ATLAS Collaborative Tool Project A broad overview."

Similar presentations


Ads by Google