Birnamwood LID Project Update Nick Russo Team Leader-Environmental Services Architecture & Engineering Division Harris County Public Infrastructure
2
Design Elements - Bioswale
3
Monitoring Plan Evaluate water quality performance of the swale and the soil media Measure runoff reduction from the swale and the soil media
4
Equipment –Automated samplers and flow meters # of samples (20-25) Monitoring locations (3) Monitoring Plan Total Suspended Solids E. Coli Orthophosphate Phosphorus, Total Total Kjeldahl Nitrogen Nitrate/Nitrite Nitrogen as Ammonia Copper, Total Lead, Total Zinc, Total Copper, Dissolved Lead, Dissolved Zinc, Dissolved
5
Precipitation and Flow Monitoring
6
Current Status Work Plan complete Monitoring Design and equipment needs pending.
7
Additional Projects Several new projects moving into study and design phase that will evaluate LID as an option for the project.