Download presentation
Presentation is loading. Please wait.
Published byOwen Joseph Modified over 9 years ago
1
K0 meeting 2007/10/17 Taito Kawasaki
2
~ 10/8 (Mon) : Prepare for experiment 10/9 (Tue) : Beam on (1.0 GeV mode) | 9 days, 18 shifts | Normal run : 31 runs, 2768 spills | tagger : 16.1×1010 event | accept : 31.6×106 event 10/15 (Wed) : Beam on (1.2 GeV mode) Decided to stop Date
3
Target system during beam time
5
Problems Masked SDC wire IH was not fixed to SDC (upside) ASD card changed : 30 -> 109 Didn’t use “clean ground” OHVR7U, R8U, L12U was fixed with optical cement IHL2,R2 booster didn’t work Input line of TUL : 32ch cable -> 64ch cable (extra 32ch was dummy) Network sometime broke (caused Target control system trouble) PM AMP caused noise (IH trigger and TDC line) -> Changed channel BPM : Veto counter was broken, a trigger counter was moved Trouble on Radcon (“Delayed signal” used ?) HV down happened (CDC ch 7) 5-6 times.-> Module ? Data Logger TDC calibration is... z
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.