Getting Underway – Engine room
Engineer – below deck Entry – bulwark door Portside mid-ship bulwark door normally open in quarters
2
Getting Underway – Engine room
Engineer – below deck Entry – bulwark door Located on the amidships Two doors Aft door is normally open when in quarters
3
Getting Underway – Engine room
Equipment room door - portside Engineer – below deck Normally open in qtrs AM hrs.
4
Getting Underway – Engine room
Equipment room door - portside Engineer – below deck Two-dog door with a keyed handle The door is normally unlocked Keys are kept: Key locker on the boat (2) Key locker in the captains office (2)
5
Getting Underway – Engine room
Engineer – below deck Equipment room passageway Primary main engine Pre lube panel To engine room ladder (down) / (up)
6
Getting Underway – Engine room
Equipment room passageway Engineer – below deck From the equipment room door the passageway runs forward to the multi-purpose room The main engine pre-lube panel is found aft on the portside. This is the primary location to initiate the main engine pre-lube cycle Engine room ventilation fans are controlled from the pre-lube panel, on /off & low / med / high
7
Getting Underway – Engine room
Engine room door – normally closed Engineer – below deck Down
8
Getting Underway – Engine Room
Engine room door Engineer – below deck ENGINE ROOM DOOR – MAIN ACCESS TO ENGINE ROOM LOCATED JUST FWD OF PRELUBE PANEL ON STARBOARD SIDE OF EQUIPMENT ROOM DOOR OPENS OUT & INTO EQUIPMENT ROOM, AND IS NORMALLY IN THE CLOSED POSITION DOOR IS 36” WIDE AND 64” TALL
9
Getting Underway – Engine Room
Engine room ladder Engineer – below deck
10
GETTING UNDERWAY – ENGINE ROOM
ENGINE ROOM LADDER ENGINEER – BELOW DECK MAIN ACCESS TO ENGINE ROOM , FOAM room AND VSP ROOM LADDER HANDRAILS ARE 30” APART
11
Getting Underway – Engine Room
Generator alarm panel Engineer – below deck Alarm Panel Primary Generator start p&s Pre lube panel – main engine engines - local control
12
GETTING UNDERWAY – ENGINE ROOM
GENERATOR START AND ALARM PANEL ENGINEER – BELOW DECK Upper panel – generator start-up Lower panel – local main engine pre lube station Located port sided of engine room ladder, engine room
13
Getting Underway – Engine Room
Slide bar – switch panel Engineer – below deck Directs power supply selection / generators p&s & shore power
14
GETTING UNDERWAY – ENGINE ROOM
SLIDE BAR – SWITCH PANEL ENGINEER – BELOW DECK Slide bar located bottom of electrical panel Used to select shore power, port or starboard generator use Pick one and it blocks all other breakers from being activated
15
Getting Underway – Engine Room
Engineer - below deck Generator meters port & starboard
16
GETTING UNDERWAY – ENGINE ROOM
ENGINEER – BELOW DECK GENERATOR METERS PORT & STARBOARD Generator meters port and starboard Located above the slide bar switch on electrical panel Top row of gauges monitor port gen Lower set monitor starboard gen Used to monitor output of generator in use
17
Getting Underway – Engine Room
Communications Engineer – below deck Intercom phone
18
GETTING UNDERWAY – ENGINE ROOM
COMMUNICATIONS ENGINEER – BELOW DECK Phone communications Located top right corner of electrical panel Used to check with pilot to make sure voith units are in neutral pitch Before starting main engines
19
Getting Underway – Engine Room
Engineer - below deck Local Main engine start panel starboard,#1 engine
20
GETTING UNDERWAY – ENGINE ROOM
ENGINEER – BELOW DECK LOCAL MAIN ENGINE START PANEL - STARBOARD Local main engine start panel #1 engine Located bottom of engine room ladder, directly over #3 pump
21
Getting Underway – Engine Room
Engineer – below deck local main engine start panel port,#2 engine
22
Getting Underway – Engine Room
Local main engine start up, port engine #2 Local main engine start up panel ,#2 engine Located bottom of engine room ladder and right, (port side of boat) over #4 pump
23
Getting Underway – Engine Room
Engineer – below deck Main ladder out of engine room
24
Getting Underway – Engine Room
After getting generator on line, and starting both main engines proceed to pilothouse
25
Getting Underway – Engine Room
Engineer – below deck Engine room door
26
Getting Underway – Engine Room
Engine room door Come back up engine room ladder to asile between equipment room and ems room Go right (forward)
27
Getting Underway – Engine Room
Engineer – below deck Ladder from ems room up to pilothouse
28
Getting Underway – Engine Room
Engineer – below deck Ladder to pilothouse Ladder located port side forward of multi-purpose room
29
Getting Underway – Engine Room
Engineer – below deck Ladder from boat deck to pilothouse
30
Getting Underway – Engine Room
Engineer – below deck Ladder continuing from multi-purpose room to pilothouse
31
Getting Underway – Engine Room
Engineer – below deck Engineer station, pilothouse forward
32
Getting Underway – Engine Room
Engineer – below deck Forward engineer station in pilothouse, port side
33
Getting Underway – Engine Room
Engineer – below deck Engineer station pilot house, aft
34
Getting Underway – Engine Room
Engineer – below deck Aft engineer station in pilothouse, starboard side