Download presentation
Presentation is loading. Please wait.
Published byKerrie Crawford Modified over 9 years ago
1
State Route 268 Rutherford County, TN DESIGN PUBLIC MEETING June 2, 2015
2
Project Team Introduction TDOT Region 3 Project Development Wiser Consultants
3
Tonight’s Schedule 5:15Presentation and Questions 5:45Open House Staff at displays to answer questions Complete comment cards and/or provide verbal comments to court reporter 7:00 Adjourn
4
Purpose of Today’s Meeting Discuss proposed improvements to SR 268 – Broad Street to Memorial Boulevard Receive input from the public Answer questions and address concerns
5
Long Range Transportation Map
6
Project Description 4.3 miles of roadway improvement Road widening, addition of shoulders, curb and gutter, and sidewalks
7
Proposed Image Render
8
Project Location SR-268 THOMPSON LANE BROAD STREET MEMORIAL BOULEVARD END PROJECT BEGIN PROJECT SR-268 SR-10 SR-1 1 2
9
Project Location SR-268 THOMPSON LANE END PROJECT BEGIN PROJECT MEMORIAL BOULVEVARD BROAD STREET SR-10 0 0.25 0.50 0.75 1.0 SR-1 SR-268 1 2
10
Proposed Overlay #1 (Battlefield) STATE ROUTE 268 Retaining Wall
11
Proposed Overlay #2 (Between Hampton and Blanton) STATE ROUTE 268 BLANTON DRIVE Existing Brick Wall
12
Project Status Environmental Planning Design Right-of-Way Construction Project Currently in the Environmental and Design Phases
13
Comments Your comments are important to us! Participate in the question-and-answer session Submit or mail-in comment cards Provide verbal comments to the court reporter
14
Contacts Lori Lange, Director TDOT Region 3 Project Development (615) 350-4391 Lori.Lange@tn.gov Fred Miller, Assistant Director TDOT Roadway Design Division (615) 741-0835 Frederick.Miller@tn.gov
15
Questions?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.