Presentation is loading. Please wait.

Presentation is loading. Please wait.

New Jersey Institute of Technology Concrete Industry Management Program Prof. David Washington, Ph.D., P.E. Instructor Concrete Industry Management Program.

Similar presentations


Presentation on theme: "New Jersey Institute of Technology Concrete Industry Management Program Prof. David Washington, Ph.D., P.E. Instructor Concrete Industry Management Program."— Presentation transcript:

1 New Jersey Institute of Technology Concrete Industry Management Program Prof. David Washington, Ph.D., P.E. Instructor Concrete Industry Management Program Department of Engineering Technology

2 Overview of Presentation Academic Year 2008 -2009 –Course Activities –Socials –Research

3 Sahara Sand of Eagleswood Tour (Silvi Group, Inc) Concrete Application I –CIM 210)

4 Sahara Sand of Eagleswood Tour (Silvi Group, Inc) Concrete Application I –CIM 210)

5 Cement Storage Tanks (Silvi Group, Inc) Concrete Application I –CIM 210)

6 Readymix Plant (Silvi Group, Inc) Concrete Application I –CIM 210)

7 Working Safely The Placement of Fast Track Concrete Sika Class Visit – Dr. Ketan Sompura (Advanced Concrete Testing – CIM 405)

8 Working Safely The Placement of Fast Track Concrete Forsgate Industrial Park (Concrete Application II) Ken Justice, PE. (NESCA) CIM 305

9 Working Safely The Placement of Fast Track Concrete Students observing placement of pervious concrete Ken Justice, PE. (NESCA)

10 Working Safely The Placement of Fast Track Concrete Students make their own sample of pervious concrete Ken Justice, PE. (NESCA)

11 Working Safely The Placement of Fast Track Concrete Rolling Pervious Concrete (Concrete Application II) Ken Justice, PE. (NESCA)

12 Overview of Presentation Academic Year 2008 -2009 –Course Activities –Socials –Research

13 Working Safely The Placement of Fast Track Concrete Socials with Sika Corp. ( Michael Campion, Vice President and director of the concrete construction product)

14 Working Safely The Placement of Fast Track Concrete Socials with Silvi Group, Inc. ( Bill Ryan from the Human Resource Department)

15 Working Safely The Placement of Fast Track Concrete Socials with Poster Presentation ( Bill Ryan listens to students as they make their Poster Presentation)

16 Overview of Presentation Academic Year 2008 -2009 –Course Activities –Socials –Research

17 The Placement of Fast Track Concrete Research with Student (Concrete Application II and Concrete Properties and Testing ) Allyn Luke’s Research Project Testing of Emergency Admixtures Forta and CIM Learning Together Gyasi Bryan-Smith Michael Ciallella Eric Miller Allyn Luke Bob Grace Marty Doody

18 Working Safely The Placement of Fast Track Concrete Mobile Barrier Trailer (NJDOT Research) Protecting Concrete Contractors on the Highway

19 NJDOT Research Project (Mobile Barriers – Protects Workers) Damaged Concrete

20 Unprotected Worker “One eye on the road”

21 Working Safely

22 The Placement of Fast Track Concrete

23 Working Safely The Placement of Fast Track Concrete The Rehabilitation Of Vermont’s Waterbury Dam’s Seepage Control Components By Innovative Schemes U.S. Army Corp. Of Engineers

24 Working Safely The Placement of Fast Track Concrete Supertop Drilling INNOVATIVE SCHEMES OF REHABILITATION

25 Working Safely The Placement of Fast Track Concrete EVALUATION AND ALTERNATIVES OF DAM PERFORMANCE E-1Cutoff Wall – Cement-Bentonite cutoff wall from crest of dam to foundation bedrock along entire length of dam. $24.9 million E-2Gorge Section Replacement - Remove gorge section (25% of dam volume), stockpile upstream, treat foundation, rebuild section $50.8 million E-3Filter Shaft – Soldier-beam & Lagging shaft excavation with filters and concrete monitoring chamber $23.2 million

26 Working Safely The Placement of Fast Track Concrete QUESTIONS ???


Download ppt "New Jersey Institute of Technology Concrete Industry Management Program Prof. David Washington, Ph.D., P.E. Instructor Concrete Industry Management Program."

Similar presentations


Ads by Google