CEZ WIND FARMS IN ROMANIA FANTANELE, COGEALAC ADRIAN BOROTEA CORPORATE AFFAIRS DIRECTOR CEZ ROMANIA
2
COMMUNICATION FROM THE EU COMMISSION TO PARLIAMENT AND COUNCIL (1) – 31.01.2011 RENEWABLE ENERGY: PROGRESSING TOWARDS 2020 TARGETS 1
3
COMMUNICATION FROM THE EU COMMISSION TO PARLIAMENT AND COUNCIL (2) – 31.01.2011 RENEWABLE ENERGY: PROGRESSING TOWARDS 2020 TARGETS 2
4
RENEWABLE ENERGY: PROGRESSING TOWARDS 2020 TARGETS SUPPORTING SCHEMES 3
5
MEMBER STATES PROGRESS IN REACHING RENEWABLE TARGETS 4
6
CEZ GROUP IS AN INTERNATIONAL UTILITY WITH A STABLE POSITION IN DOMESTIC MARKET AND A GROWING PORTFOLIO IN CEE 5
7
CZECH REPUBLIC: RENEWABLES SUPPORT
8
ROMANIA: SUPPORTING SCHEME
9
8 CEZ WINDFARM PROJECT IN ROMANIA WILL BE THE LARGEST ON-SHORE IN EUROPE
10
9 CEZ WIND PARK IS DESIGNED TO PRODUCE 600 MW
11
10 CEZ WIND PARK IS DESIGNED TO PRODUCE 600 MW
12
11 WIND TURBINE PARTS WERE DELIVERED FROM DIFFERENT PARTS OF THE WORLD VIA MIDIA HARBOR
13
12 120 TURBINES EACH OF 2.5 MW WERE INSTALLED AT FANTANELE BY THE END OF 2010
14
13 THE MAIN TRANSFORMER STATION AT TARIVERDE WAS THE FASTEST TO BE BUILT IN ROMANIA
15
14 THE FIRST TURBINE WAS ENERGIZED IN JUNE 2010
16
15 CEZ GROUP INVESTMENT BRINGS MANY BENEFITS ALSO TO LOCAL COMMUNITIES WHERE THE WIND FARM WILL OPERATE
17
16 CEZ GROUP USED LOCAL EXPERIENCE DURING SUCCESSFULL IMPLEMENTATION OF THE WIND FARM PROJECT