CVE 4070 Construction Engineering Project Closeout & Pyramid Solution

Similar presentations


Presentation on theme: "CVE 4070 Construction Engineering Project Closeout & Pyramid Solution"— Presentation transcript:

1 CVE 4070 Construction Engineering Project Closeout & Pyramid Solution
Prof. Ralph V. Locurcio, PE

2 Project Closeout-1 PM Responsibilities
Manage closeout inspection process Ensure final construction details done Ensure testing completed Ensure as-builts completed & filed Schedule occupancy Monitors site cleanup Make final payments

3 Project Closeout-2 Project Documentation Prep & deliver O&M manual
Establish project files; RFI’s, Changes, Payments, Vendor info, Shop Drawings. As-built drawings to user & archive

4 Project Closeout-3 Transfer Project to Owner/User
Train O&M personnel on systems Complete punch list items Conduct walk thru with Owner/User File warranties with Owner/User Cover any life safety issues Complete transfer documentation

5 The First Pyramid Solution

6 Pyramid Solution-1

7 Pyramid Solution-2

8 Pyramid Solution-3

9 Veterans Day Holiday Go out and hug a veteran tomorrow…


Download ppt "CVE 4070 Construction Engineering Project Closeout & Pyramid Solution"