Download presentation
Presentation is loading. Please wait.
Published byBernadette Mosley Modified over 9 years ago
1
DCS Workshop, CERN MARCH 2004. ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters with an active area of 186 x 19 cm 2. A signal from each module will be made from an AND between the two counters
2
Detector CAEN SY1527 PVSS II Ethernet Database(s) OPC client DIM client 120 High VoltageLow Voltage User interface PVSS II HV Cosmics (ACORDE) Control room (ACR) [FSM?] Crate Control TCP/IP OPC Server PVSS II OPC CLIENT CANBus Wiener OPCserver PVSS II OPC client C VME (wiener? YES) 11 28/02/03 1 E
3
Cosmics (ACORDE) QUESTIONS High Voltage –1400 – 2000V, 120 channels (=60 modules) –What type of power supplies: 1 CAEN SY1527 –Can the power supplies be placed in the counting room?: yes –What type of HV cable?: HV coaxial cable Low Voltage NO Crate/Equipment Control (?) –Is there any equipment to be controlled/monitored (e.g. VME crates)? YES, WE WILL HAVE ONE VME CRATE TO PLUG IN CRT electronicS modules TO MONITOR SCINTILLATOR COUNTER RATES and set Threshold values Environment monitor: NO –Temperature (other than Front-End), humidity etc. Any other system (calibration, alignment, …)? NO
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.