Download presentation
Presentation is loading. Please wait.
Published byMiles Rose Modified over 9 years ago
1
TG 11 overview / Material screening Hardy Simgen MPI für Kernphysik for Task Group 11
2
Outline News on hardware: -spectrometers Gas counting systems and radon monitor New results: Radon emanation measurements → Talk by Grzegorz Zuzel Radon behaviour in liquid nitrogen → Talk by Krzysztof Pelczar -ray screening results Other news
3
News on hardware: LNGS GeMPI 3 + GeMPI 4 Both detectors suffer a 207 Bi contamination from within the cryostat GeMPI 4 cryostat was opened and thouroughly etched in July ’07 October ’07: 207 Bi 10x lower, but still present
4
News on hardware: LNGS GeMPI 3 + GeMPI 4 Nov 07: FET failure in GeMPI 4 (UPS problem?) has to be repaired Future plans: GeMPI 3 + 4 will be brought to MPIK for dismounting, electropolishing & replacing parts March / April 08 Refurbish Ge-diodes at Canberra Mounting cryostats @ MPIK June / July 08 ?
5
News on hardware: LNGS GATOR New ultra-low background, 2.2 kg (100 % relative efficiency) HPGe- spectrometer at LNGS End of 2007: FET broken Exchanged at Canberra Supposed to be back at Gran Sasso in these days
6
News on hardware: MPIK Low-Level Laboratory (LLL) Renovation of LLL completed end of 2007
7
News on hardware: MPIK Ge-spectrometers DAQ system re-started Muon-veto gas counters not yet running: Gas supply system missing (→ this week) Corrado/Bruno: OK Dario: LN 2 cooling system broken: Detector was warm for months Cryostat had to be removed from the shield for fixing
9
News on hardware: MPIK Adam Recently refurbished borehole detector Veto counters to be checked
10
News on hardware: MPIK Gas counting system Entering in the GERDA construction phase: Need for 222 Rn counting system at LNGS to check cryostat, cryogenic infrastructure, lock, … Proposal: Re-use of GNO counting system Very low background Convenient location (in hall A) Requires gas handling and proportional counter filling line at Gran Sasso.
11
System almost ready After test at MPIK → shipping to LNGS in summer
12
News on hardware: LAr purification column for LArGe Modification of support system and temperature sensors Ready in April 08
13
News on hardware: Radon monitor Expected to be ready in May 08. Not yet any experience with Ar.
14
-ray screening results: Recently investigated samples LabSample descriptionUsed forMass [g] LNGS PMT basesLArGe setup1522 VM 2000 with glue LArGe setup / water tank 1233 Baksan HV feedthrough SuhnerLArGe setup211 Signal feedthrough 50-SuhnerLArGe setup320 IRMM Big capacitors 8200 pFLArGe setup105 Small capacitors 4700 pFLArGe setup31 Resistors 470 kΩLArGe setup49 Steel cable Detector string suspension 2290 Steel platesTransport chain12383 Copper screwsMatrix mounting1062
15
-ray screening results: Electronics components Sample specific activity [Bq/kg] 228 Th 228 Ra 238 U 226 Ra 40 K HV feedthrough Suhner 0.23 0.020.51 0.0435.7 0.4 Signal feed- through 50-Suhner 0.04 0.010.07 0.026.2 0.2 Big capacitors 8200 pF 1.0 0.11.3 0.10.4 0.1 5.2 0.3 5.7 0.4 2.5 0.2 Small capacitors 4700 pF 0.9 0.11.3 0.12.2 0.3 11.6 0.6 14.1 0.9 0.8 0.2 Resistors 470 kΩ 0.20 0.020.13 0.030.4 0.2 0.28 0.03 0.6 0.1 0.2 0.1
16
-ray screening results: Suspension system Sample specific activity [mBq/kg] 228 Th 226 Ra 40 K 60 Co 137 Cs Steel plates 0.6 0.2 0.8 0.3 <3.7 1.2 0.413 1 Steel cable before cleaning 13.4 1.513.2 1.63600 200172 92.8 0.6 Steel cable after cleaning 1,2) 2.1 1.03.1 1.5 <9 200 12 <2 Cu screws<1 <7<0.5<8 1) Activities somewhat overestimated due to slightly different MC geometry. 2) Cleaning: a) Ultrasonic bath with soap, b) Rinsing with 2-propanol, c) Drying.
17
-ray screening results: PMT bases and VM 2000 Sample specific activity [mBq/kg] 228 Th 228 Ra 238 U 235 U 226 Ra 40 K VM 2000 with glue <1.2<2.2<39<1<1.6 140 10 PMT bases 14 18.3 1.4650 8033 4 <5.9 340 20
18
Other news Paper on stainless steel screening almost ready for submission Retirement of Wolfgang Hampel in summer 08 → no longer TG11 leader
19
Thanks to… Laura Baudis Joel Gasparro Wolfgang Hampel Mark Heisel Mikael Hult Jürgen Kiko Matthias Laubenstein Anatoly Smolnikov …for providing input and slides.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.