Maintenance Nov 28, 2007. Accelerator Access LINAC will remain on RA. It is not yet running. LINAC will remain on RA. It is not yet running. Booster-

Similar presentations


Presentation on theme: "Maintenance Nov 28, 2007. Accelerator Access LINAC will remain on RA. It is not yet running. LINAC will remain on RA. It is not yet running. Booster-"— Presentation transcript:

1 Maintenance Nov 28, 2007

2 Accelerator Access LINAC will remain on RA. It is not yet running. LINAC will remain on RA. It is not yet running. Booster- No Access. Booster- No Access. AGS- RA 0800-1400hrs. AGS- RA 0800-1400hrs. RHIC Experimental and select areas on RA. RHIC Experimental and select areas on RA. RHIC RF area on 1004b control am. RHIC RF area on 1004b control am.

3 Schedule: Injectors off at 0600hrs. Injectors off at 0600hrs. RHIC off at 0800hrs or dump. RHIC off at 0800hrs or dump. AGS Swept secured at 1400hrs. AGS Swept secured at 1400hrs. RHIC areas swept as work is completed or 1500hrs. RHIC areas swept as work is completed or 1500hrs. Experiments Swept at 1600hrs. Experiments Swept at 1600hrs. RHIC secured by 1700hrs. RHIC secured by 1700hrs.

4 Major impact jobs Power outage at 4B panel P4BRP5. Power outage at 4B panel P4BRP5. Substation R, building 929 RF equipment affected. Substation R, building 929 RF equipment affected. AGS vacuum chamber at L5 replacement. AGS vacuum chamber at L5 replacement.

5 Reminders: Approved jobs only. Approved jobs only. Testing period after jobs completed. Testing period after jobs completed. Affected groups input for job closeout. Affected groups input for job closeout. Personnel available until systems prove operational. Personnel available until systems prove operational.