15.10.01DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden 15.10.01 u Organization u DCS system overview u Implementation strategy u Status
2
15.10.01DCS overview - L.Jirdén2 PROJECT GOALS u Ultimate goal “A working DCS ready for exploitation end 2005 allowing to control and operate the experiment during all modes of operation and according to defined requirements”. u Intermediate goals u Test-beams u Pre-assembly u Installation u Commissioning
3
15.10.01DCS overview - L.Jirdén3 Main requirements u Integrate all activities necessary to operate the experiment u All detectors and infrastructure during runs and shutdowns u Easy to operate u 2 – 3 non-expert operators should be enough u Exclusive and concurrent operation u Allow for multiple operators u Individual operation of detectors and sub-systems u Access at all levels with unique access control u Automation u Standard procedures, learning system
4
15.10.01DCS overview - L.Jirdén4 Requirements cont. u Modular, scalable and flexible u Allow for changes and addition of devices, sub- systems or detectors u Reliable u Operational during runs and shutdowns u Redundancy for critical functions non- accessible during runs u Maintainable u Assume 15 years operation
5
15.10.01DCS overview - L.Jirdén5 ALICE Controls Coord. team (ACC) DAQ Trigger Offline LHC M. Ext. Services Lennart Jirden Andre Augustinus Tarek Ben Ahmed 50% Sorina Popescu (PJAS) vacancy
6
15.10.01DCS overview - L.Jirdén6 ALICE Controls Coord. team (ACC) ALICE Controls Board (ACB) ALICE Techn. Coord. Techn. Board DAQ Trigger Offline LHC M. Detectors Ext. Services Lennart Jirden Andre Augustinus Tarek Ben Ahmed 50% Sorina Popescu (PJAS) vacancy
7
15.10.01DCS overview - L.Jirdén7 ALICE Controls Coord. team (ACC) Joint Controls Project (JCOP) ALICE Controls Board (ACB) ALICE Techn. Coord. Techn. Board DAQ Trigger Offline LHC M. Detectors Ext. Services IT-CO group EP Management ATLAS Controls Coord. CMS Controls Coord. LHCb Controls Coord. Lennart Jirden Andre Augustinus Tarek Ben Ahmed 50% Sorina Popescu (PJAS) vacancy
8
15.10.01DCS overview - L.Jirdén8 ECS/DCS Context ITS hv lv p TT pixeldriftstrip TPCMUON safety access DAQ Trigger Offline LHC ECS DCS electricity magnet gas cooling Detectors Primary Services Associated Projects Supervisory Function
9
15.10.01DCS overview - L.Jirdén9 Hierarchical model TPC-FC ELECTRTPC LHCm TRD ECS FEE TRIGTPC-M DAQDCS FEC HVCOOL CAEN5 TRACK HEAT MUONMAG … … … LV detectors … Sub- detectors Sub- systems devices
10
15.10.01DCS overview - L.Jirdén10 Sub systems
11
15.10.01DCS overview - L.Jirdén11 Detectors and sub- systems DCS............ 15 detectors ~ 20 sub-detectors ~ 6 sub-systems/sub-detector Several devices/sub-system
12
15.10.01DCS overview - L.Jirdén12 Controls slices DCS............ 15 detectors ~ 20 sub-detectors ~ 6 sub-systems/sub-detector >100 controls slices !!
13
15.10.01DCS overview - L.Jirdén13 Hardware architecture
14
15.10.01DCS overview - L.Jirdén14 Software frameworks SCADA (PVSS) FSM, DB,web, Etc. VME/PC (Linux)PLC (Step7,etc) SliCUNICOS SCADA Framework Supervisory application OPC, DIM ? Proc. Contr. Applic. Supervision Communication Process control
15
15.10.01DCS overview - L.Jirdén15 What is the SCADA framework? u An integrated and coherent set of guidelines, tools and components u Standard monitoring and configuration panels u Standard script libraries, Finite State Machines, u Standard devices (CAEN HV, Wiener PS, etc) u At the disposal of sub-system developers u Each component is developed independently but in a coherent way to fit in the global system u For the two main types of components: Control Units (CU) Device Units (DU)
16
15.10.01DCS overview - L.Jirdén16 Software architecture TPC-FC ELECTRTPCTRD ECS FEE TRIGTPC-M DAQDCS FEC HVCOOL CAEN5 TRACK HEAT MUON … … … LV Device Units (DU) Control Units (CU) To devices Status and Alarms Commands
17
15.10.01DCS overview - L.Jirdén17 Functionality (FSM) Configurat Logging Alarm handling Access handling Child Control Unit Parent Command & status Command & status Command & status Command & status dBase operator PVSS
18
15.10.01DCS overview - L.Jirdén18 Functionality (FSM) Configurat Logging Alarm handling Device driver Device Device Unit Parent Command & status Command & status Setting & reading dBase operator PVSS
19
15.10.01DCS overview - L.Jirdén19 Concurrent operation TPC-FC TPC ECS FEE TRIGTPC-M DCS FEC HVCOOL CAEN5 TRACK HEAT MUON … … … LV Device Units Control Units To devices Status and Alarms Commands Operator A Operator C Operator B
20
15.10.01DCS overview - L.Jirdén20 Services overview u Cooling & Electricity u Primary circuits controlled via ST div – SCADA u Secondary circuits controlled via ALICE – DCS – SCADA u Status information exchanged via servers u Gas u Gas control handled by Gas WG u Based on JCOP standards u LHC Cryo Control system used as model
21
15.10.01DCS overview - L.Jirdén21 Gas control ex. TPC-FC PURIF TPCTRD GAS FEE TPC TPC-M DCS VALVFEC TRD COOL HEAT … … MIX devices PUMP … FLOWMANO TPC-FCTPC-M sub- systems sub- detectors SAFETY COOL…
22
15.10.01DCS overview - L.Jirdén22 Services overview u Cooling & Electricity u Primary circuits controlled via ST div – SCADA u Secondary circuits controlled via ALICE – DCS – SCADA u Status information exchanged via servers u Gas u Gas control handled by Gas WG u Based on JCOP standards u Magnets u Common control for all 4 LHC experiments u Handled by EP-TA3 u Status information exchanged servers
23
15.10.01DCS overview - L.Jirdén23 Magnet control ex. TPC-FC MAGTPC LHCm TRD ECS FEE ATLASTPC-M DAQDCS DEV1FEC DI-MUONCOOL ALICE HEAT … … L3 … devices COMP CMS … DEV2DEV3
24
15.10.01DCS overview - L.Jirdén24 Services overview u Cooling & Electricity u Primary circuits controlled via ST div – SCADA u Secondary circuits controlled via ALICE – DCS – SCADA u Status information exchanged via servers u Gas u Gas control handled by Gas WG u Based on JCOP standards u Magnets u Common control for all 4 LHC experiments u Handled by EP TA3 u Status information exchanged servers u Detector Safety System u LHC Experiments WG started u Scope and requirements being defined
25
15.10.01DCS overview - L.Jirdén25 Detector Safety System CERN Safety Fire Smoke Gas Central DCS “Backend” D.I. DSS “Frontend” L3 Alarms L1, L2 Alarms
26
15.10.01DCS overview - L.Jirdén26 DAQ, TRG, Offline, LHC machine TPC-FC TPC LHCm TRD ECS FEE TPC-M OfflineDAQ FEC COOL HEAT … … TRGDCS … …
27
15.10.01DCS overview - L.Jirdén27 Implementation strategy u A. Process control for the detectors u Identify common requirements u Design “ALICE common solutions” u Pilot applications - test cases u Collaboration ACC – detector groups u Aim to cover all main functions – minimize number of special cases u B. Operations and supervisory functions u Link detector process control to supervisory layer u Implement vertical slice & use PVSS framework tools u Pilot applications – test cases u Collaboration ACC – detector group – JCOP
28
15.10.01DCS overview - L.Jirdén28 Implementation strategy u C. Services u Determine required functions and responsibilities u Pilot applications – test cases u Collaboration ACC – detector groups – CERN services u D. Links to ALICE DAQ, TRG, offline u Initiate common projects u Pilot applications – test cases u Collaboration ACC – DAQ, TRG, offline – detector group
29
15.10.01DCS overview - L.Jirdén29 Implementation strategy u E. Links to LHC u Experiment common project (JCOP) u F. Controls Infrastructure u Define requirements u Collaboration ACC – DAQ – Infrastructure group
30
15.10.01DCS overview - L.Jirdén30 Where are we today? u Concentrating on Process Control for detectors first u Requirements u Collecting information from the Detector groups u TDR’s, workshop, questionnaires, discussions u Creating a “channel inventory database” u Producing a document with the “functional requirements” u Aim for one URD per detector u Template u The first draft URD’s ready
31
15.10.01DCS overview - L.Jirdén31 u Prototyping common solutions u Three pilots: u Prototype TPC pilots planned for TPC test- beam in May 2002 u “Vertical slice” for HMPID in progress u TPC u High Voltage u Low Voltage u Cooling u HMPID u High Voltage u Low Voltage u Fluid system Where are we today? u TPC Fieldcage u High Voltage u Low voltage (r-rod current) u Cooling (r-rod)
32
15.10.01DCS overview - L.Jirdén32 PC-PVSS PC-OPC server TPC Cooling test (may 2002) FEC May 2002 Wago mPLC Wago module ADC 0-10V PT1000 sensors Heater Flow meter Fieldbus PID Regulation Ethernet/TCP 0.1 degree C stability
33
15.10.01DCS overview - L.Jirdén33 Conclusion u DCS project re-launched since 6 months – first achievements: u Global project outline approved and contacts with most detector groups established u Basic implementation strategy defined and work-plan being prepared u Pilot prototyping of common solutions started u Controls Coordination team now 3.5 people