CURRENT CHALLENGES FACING HYDROPOWER DEVELOPMENT IN EUROPE Brussels 1-2 october 2009 Sara Gollessi APER (Association of Producers of Energy from Renewables) The situation in Italy….
2
HYDRorPOWER? Assessment, at river basin level, of possible hydropower productivity with reference to objectives and targets set by WFD and RES-e Directives www.esha.be/sherpa
3
WFD transposition in Italy Legislative Decree 152/2006 OFFICIAL TRANSPOSITION Law 27/02/2009 n. 13 temporary extension of “old” River Basin Authorities, until the “new” district authorities will be fully operative and setting of deadlines: Sources: - Regional water protection plans - river basin authorities studies and assessments 30/06/09 RBMP drafts (WFD: 2008) public consultation (WFD: 2006) 22/12/09 RBMP approval (WFD: 2009) Great delay in the transposition and consequently implementation of the WFD 3 infraction procedures (failure to transpose the directive, failure to fulfil obligations under art. 3, failure to fulfil the obligations under art. 5.1 and 15.2) SHORT TIME !!
4
The role of the Ministry of environment….
5
RES Directive transposition (Directive 2009/28/CE) Law 27/02/09 n. 13 (art. 8bis) BURDEN SHARING Within 90 days the Ministry of Economy will set the sharing among the Regions of the national target for 2020 June 2009: extension of the deadline other 2 months! Law 23/07/09 n. 99 (art. 27, c.16) POTENTIAL The Ministry of Economy will set common criteria and procedures to assess the renewable potential and the available resources. Still waiting for the “Community Law” OFFICIAL TRANSPOSITION of the Directive 30/06/2010 deadline for delivery of ACTION PLANS!
6
Hydropower in Italy Installed capacity (2007 & 2008) Total renewables Hydropower Production (2007 & 2008) Hydropower Total renewables
7
Renewables production trend PVwindbiomass geothermal hydrototal
8
Distribution of HP production Year 2008 – source GSE Po river basin district
9
PO river basin - Lenght of the river: 657 Km - Catchment area: 74.000 km 2 - 1586 rivers (1522 natural and 64 HM) - 96 lakes (13 natural and 54 HM) - 900 HP plants - 50% of total installed capacity - 180 artificial reservoirs
10
Industrial concentration
11
Morphological alterations
12
Ecological status bad good
13
Pollution bad good
14
Natural, articifial and HM HM artificial natural
15
Present status
16
Ecological status: objectives
17
Chemical status: objectives
18
Natural water bodies (rivers)
19
HMWB (rivers)
20
Artificial water bodies (rivers)
21
Measures Improving the efficiency of the existing HP plants through experimental operational procedures Review of the concessions in case of water scarcity Removal or modification of transveral and longitudinal structures to allow fish migration Sediment management programmes at regional scale quite general not linked to a specific environmental context the economic analysis is still missing
22
Conclusions HMWB: the designation of a river as HMWB was specifically caused by the hydropower use only in a few cases Existing HP plants: even if the majority of the potential is already exploited, the international commitments for the reduction of greenhouse gasses emissions will not allow to impose hard restrictions to the existing concessions. New HP plants: the big number of new requests for SHP concession seems to be incompatible with the achievement of the WFD objectives. Possible solution Certification!!