Download presentation
Presentation is loading. Please wait.
Published byArline Glenn Modified over 9 years ago
1
A Guide to Time & Material Projects Beginner
2
Agenda Overview – intended use Set-up Processing – invoice vs. progress billing Reporting – report generator codes, Detailed Cost Ledger
3
Construction Management System Profile
4
Job Profile
5
Cost Types
6
Unit of Measure – used for charging weekly or monthly amounts for project managers Non-recoverable – any items or types that you will use to track costs, but cannot charge back to the customer Cost Items – mark-up not used as often as types, but can indicate that same % charged on all types in that item
7
Labor
8
Equipment
9
Prepare Billings Edit/Cancel Billings Add Lines
10
Edit/Cancel Billings
11
Add Lines
12
Print Billing Report
13
Detail vs. Summary Cost & Billings vs. Billings Only Show/Suppress Labo(u)r cost Show Mark-up as % or $
14
Prepare Invoices You must fill in the Sales Category or it will not create an invoice H/B – S/Y/N Style – D/S
15
Edit Billing Flag Used to switch a line from Never Bill it to Bill it & vice versa
16
Flag Unbilled Job Postings Used to mark a posted item as having been billed on an invoice Normally used when one chooses to “Add Lines” in Edit/Cancel Billings to bill early for an item that is posted at a later date Indicate on which invoice this was billed so reports are correct
17
Reports Billing History Report Detailed Cost Ledger – show Construction Management Billing information Report Generator – codes DCMBM, DCMDT, DCMBW
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.