Download presentation
Presentation is loading. Please wait.
Published byTracy Fisher Modified over 9 years ago
1
® Webinar #10 Commercial First-Class Mail and Standard Mail Measurement Presented by Tom Day Senior Vice President, Intelligent Mail and Address Quality Dave Williams Manager, Processing Operations Friday, January 16, 2009
2
® 2 Overview of First-Class Mail and Standard Mail measurement Interim solution Long-term solution Measurement Challenges BMEU Seeding Results Operational Issues Agenda for Today’s Discussion Commercial Mail Measurement
3
® 3 Essentials of Service Measurement: Three data points required: “ Start-the-clock”; when the mail entered USPS network “Stop-the-clock”; when did USPS effect, or in some cases attempt, delivery Established Service Standard for comparison Service Measurement - Essentials
4
® 4 Hybrid Approach: Will take effect with the implementation Intelligent Mail (specific release date to be determined) Applies to: First-Class (Pre-sort) Standard Periodicals (future) Supplements mail scans from internal Intelligent Mail® system with externally collected data Commercial Mail Measurement
5
® 5 Origin Processing Destination Processing Delivery Acceptance Transport to Delivery Unit Transport to Destination Delivery Unit Processing Stop-the-Clock External reporters scan IMb on mail at delivery Visible through Intelligent Mail, up to final MPE Operation Code or other scan event External Measurement External Reporters will scan live mail Contractor will calculate delivery service performance factor for each mail class Factor combined with IM data to form end-to-end measurement Hybrid Measurement Approach Delivery Factor External Stop-the-Clock Commercial Mail Measurement
6
® 6 Commercial Mail Interim Approach Will use “first processing scan” at point of entry as a proxy for Start-the-Clock Processing scan on USPS automated equipment clearly demonstrates the mailing has been entered into USPS Network As Mailers/USPS demonstrate capability, we will transition to container scans at entry Commercial Mail Measurement
7
® Manifest Created Mailer Facility Origin Entry at BMEU Last MPE ScanStart-the-Clock USPS Processing Facilities DPS / Flat Sorter scans BMEU arrival time recorded by Clerk PostalOne! Delivery External Reporters scan IMb on all mail they receive Stop-the-Clock (delivery factor calculated)
8
® PostalOne! Start-the-Clock Manifest Created Mailer Facility Verification time recorded by Clerk Origin Entry at DMU Last MPE Scan USPS Processing DPS / Flat Sorter scans Delivery External Reporters scan IMb on all mail they receive Stop-the-Clock (delivery factor calculated)
9
® 9 Standard Mail Measurement challenges Destination Entry Saturation Mail Home Depot method by carrier route 750 sites scanning when saturation mail arrived Scanning static barcode for the last delivery date (if in-home specific dates requested) Scanning static barcode when last pieces are taken to the street or delivered to a po box Additional sites in quarter 2 Commercial Mail Measurement
10
® 10 Standard Mail Measurement challenges Carrier route bundles (future) Density mailings Container scanned when arrived at unit Random bundle scanning when delivered Commercial Mail Measurement
11
® 11 IMAQ BMEU First-Class Mail Seeding Trend Commercial Mail Performance First-Class Mail
12
® 12 IMAQ BMEU Seeded Commercial First-Class Mail 30 Day Period Ending January 9, 2008 Commercial Mail Performance First-Class Mail Pieces% On TimeTargetGap Overnight2712688%96.5%8.5% 2 Day2490286%94.0%8.0% 3 - 5 Day2467369%92.7%23.5%
13
® 13 IMAQ BMEU Standard Mail Seeding Trend Commercial Mail Performance Standard Mail
14
® 14 Commercial Mail Performance Standard Mail
15
® 15 Operational Issues
16
® 16 Discussion of Operational Impacts EXFC Overnight Letter Service Impact FY 2009 Quarter I 2.09 % point impact 0.11 % point impact 1.55 % point impact
17
® 17 Impact of Processing and Transportation Delivery Unit Processing Origin Processing Destination Processing Delivery Acceptance Transport to Delivery Unit Transport to Destination Collection Collections / Acceptance Processing and Transportation Last Mile % On- Time EXFC Overnight Letters 0.11%1.55%2.09%96.25% Discussion of Operational Impacts
18
® 18 Collections / Acceptance Processing and Transportation Last Mile % On- Time EXFC Overnight Letters0.11%1.55%2.09%96.25% IMAQ BMEU Overnight Letters0.00%12.00%2.09%85.91% Delivery Unit Processing Origin Processing Destination Processing Delivery Acceptance Transport to Delivery Unit Transport to Destination Collection Impact of Processing and Transportation Discussion of Operational Impacts
19
® 19 Collections / Acceptance Processing and Transportation Last Mile % On- Time EXFC Overnight Letters0.11%1.55%2.09%96.25% IMAQ BMEU Overnight Letters0.00%12.00%2.09%85.91% EXFC 2 Day Letters0.08%5.20%1.85%92.87% IMAQ BMEU 2 Day Letters0.00%14.00%1.85%84.15% EXFC 3 Day Letters0.06%11.71%1.48%86.75% IMAQ BMEU 3 Day Letters0.00%31.00%1.48%67.52% Impact of Processing and Transportation Discussion of Operational Impacts
20
® 20 Summary of Key Points Everything counts Scanning Secure BMEU hand-off procedures Operating plan and 24 hour clock adherence discipline Standardized mail flows in place High levels of machine and operator method quality Right mail on the right network at the right time Commercial Mail Measurement
21
® 21 ANY QUESTIONS??
22
® Webinar #11 Friday, January 23, 2009 “Periodicals Measurement” ̶̶ Presented by Lizbeth Dobbins and Maryellen Clarke SAME TIME SAME WEB ADDRESS SAME CONFERENCE NUMBER SAME PASSCODE
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.