Presentation is loading. Please wait.

Presentation is loading. Please wait.

ADAMANTIUM WP5 Integration of Systems, Components and Services, Field Trials and Evaluation.

Similar presentations


Presentation on theme: "ADAMANTIUM WP5 Integration of Systems, Components and Services, Field Trials and Evaluation."— Presentation transcript:

1 ADAMANTIUM WP5 Integration of Systems, Components and Services, Field Trials and Evaluation

2 WP 5: Integration of Systems, Components and Services, Trials and Evaluations WP5 Leader DEM Duration [M10-M30] Status Ongoing (Task 5.4 Trials and Evaluations)

3 Task 5.1 Integration of Systems and Components A small scale ADAMANTIUM Prototype  IMS (Release 7) HSS P-CSCF S-CSCF I-CSCF PDF (v6)-> PCRF (v7) I-BGF (Performs policy enforcement functions under the control of IMS) -> Integrated within IMM/EMM  Access Network PCRF Access Network Marking Module (IMM) Access network Monitoring Module (EMM) Tests performed over VODAFONE UMTS access network  Core Network DiffServ Core Network Marking Module (IMM) Core Network Marking Module (EMM)  MCMS TNMM Internal Interface with AEM External interface with TN TNAM Internal Interface with AEM External interface with TN ANAM Internal Interface with AEM External interface with AN ANMM Internal Interface with AEM External interface with AN MSMM Internal Interface with AEM External interface with MSRF MSAM Internal Interface with AEM External interface with MSRF

4 Task 5.1 Integration of Systems and Components (II) Integration of the MCMS into the IMS platform Integration of the monitoring and adaptation modules (internal and external)

5 Integration of MCMS with Core Network Integration of the monitoring and adaptation modules at the transport network (i.e. TNMM,TNAM)

6 Integration of MCMS with Access Network Integration of the IMS infrastructure over the UMTS access network Integration of the monitoring and adaptation modules at the access network (i.e. ANMM,ANAM) Integration of RS UMTS Base Station Emulator CMU200 Integration with software UMTS emulator Integration with VODAFONE Greece UMTS Access network

7 Task 5.2 Integration of IPTV application All the IPTV components have been integrated: The final version of the MSRF integrates the following components: SIP User Agent (for session initiation, receiving adaptation commands and session teardown) RTSP Server for media delivery control: play, pause; Media streamer to send the video content to the user; Media Controller, which manages available contents on the server; MMIF which enforces the adaptation commands. The final version of the IPTV clients was also integrated, which includes the following: Media Controller, which creates the session when the user selects a media; SIP User Agent for session control; RTSP Client, for media control; Media Player to receive and play the video content; Adapter to generate the terminal's capabilities and to update the playing process on successful adaptation responses.

8 PQoS aware 3G mobile terminal Task 5.3 Integration of VoIP Applications

9 Integration of VoIP Applications PQoS aware Soft Phone

10 Task 5.4 Trials and Evaluation Till M24 the actions that have been performed are:  Continuous testing and debugging of the various modules (Software Debugging)  Evaluation of the results and actions that are performed (Logical Debugging)  Preparation of the audit DEMO. Targets to be fullfilled:  To conduct performance evaluation measurements for various media contents and conditions  Scientific Publications  To identify the bottlenecks or “weak points”  To produce guidelines that will be used to support the business plan.

11 Audit Demo Two fully Functional Scenarios will be demonstrated: 1.VoIP Scenario 1.Real time codec adaptation at the terminal when the terminal generates warnings 2.MCMS monitoring and adaptation when a RED alarm is initiated 2.IPTV Scenario 1.Real time spatial resolution adaptation at the terminal when the terminal generates warnings 2.MCMS monitoring and adaptation when a RED alarm is initiated

12 WP5 MM Allocation

13 Thank you


Download ppt "ADAMANTIUM WP5 Integration of Systems, Components and Services, Field Trials and Evaluation."

Similar presentations


Ads by Google