Download presentation
Published byBernadette O’Brien’ Modified over 9 years ago
1
WEEKLY SAFETY MEETING July 15th, IRI 750 OGEC rig N’Giri - 3
2
Weekly statistics Days LTI free: 114 Stop cards: 20 Accident / Incident reporting from last week : 00 Anomalies: 0 Safety Alerts: 0 Drills/Training: 2 (Muster drill + Kick drill) Mini-camp inspection: 1 Rig inspection: Daily rig safety tour done by both HSE on site Comments : New fire pump ready to be used New bins for waste segregation
3
HSE TOPICS Communication : Importance of reporting. New comer on site, changing of shift with daily handover (night and day) Housekeeping : Concern each one of us, after job to clean work area, housekeeping is a daily job. Good HKP reduce the risk of fall by trip hazards and slippery. PTW : Need a time for preparation. Plan your job and request the PTW in advance. It’s save time for everyone. Each PTW requires JSA/JRA. Safety devices : - Reference, date, place
4
Together E&P’s Golden Rules Hygiene Safety Environ ment Security
Societal 4
5
WHY TOTAL’S GOLDEN RULES
12 HSE GOLDEN RULES WHY TOTAL’S GOLDEN RULES 1 2 3 2 5 6 7 8 9 10 11 12 12 HSE GOLDEN RULES done by HSE Head – L.DAT
6
TOTAL’S GOLDEN RULES HIGH-RISK SITUATIONS CONFINED SPACES TRAFFIC
12 HSE GOLDEN RULES TOTAL’S GOLDEN RULES 1 2 3 2 5 6 7 8 9 10 11 12 HIGH-RISK SITUATIONS CONFINED SPACES TRAFFIC SIMULTANEOUS OPERATIONS BODY MECHANICS AND TOOLS WORK PERMITS PROTECTIVE EQUIPMENT LIFTING WORK AT HEIGHT CHANGE MANAGEMENT EXCAVATION WORK WORK ON POWERED SYSTEMS
7
E&P's Golden Rules Change Management
The Golden Rules – Change management - SUPERVISOR
8
Management of change If one of your workers observes a change:
Take action on any questions If necessary, obtain pertinent information for him/her about the change If you make a change: Analyse the risks of its consequences Make sure that the appropriate compensatory measures are taken Update the relevant plans and procedures Give your team the practical details of why and how the change is to be made Give precise instructions concerning what they have to do Remember to train personnel or have them trained if necessary - Reference, date, place
9
Management of Change - The Golden Rules - PPE - SUPERVISOR
10
3 Questions ? Answers TOTAL Campaign
- Reference, date, place
11
New fire pump - Reference, date, place
12
WASTE SEGREGATION - Reference, date, place
13
THANKS FOR YOUR ATTENTION
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.