Download presentation
Presentation is loading. Please wait.
Published byMabel Fletcher Modified over 9 years ago
1
Bridge Building We all have to start somewhere!
2
A few bridge-building suggestions Pay attention to the rubric Get the right materials Don’t wait until the night before!!! Keep the due date in mind…. A-Day classes: Jan 15 th B-Day classes: Jan 14 th
3
Some Hints… Wax paper to protect your table Ruler to keep things lined up Sketch your plan on a piece of paper and build over it
4
Handy Things to Have on Hand Sandpaper to shape sticks or clean up rough edges. Weights or heavy objects to hold things in place while the glue dries.
5
More Handy Things Prop up parts against books or weights to keep them square Clamps might help to hold things in place (this one was too big).
6
Be Resourceful Cut the sticks to needed length Use every piece if possible Remember how the bridge will be tested After 50 sticks, this was all that remained.
7
To Think About Laminating the sticks makes them very strong but uses a lot of sticks Use the sticks to form structural shapes such as I -beams Take advantage of online resources… Such as garrettsbridges.com And many others…
8
Bridge Day Your bridge will be tested by applying a simulated mass to the deck The testing device automatically senses when your bridge fails
9
Something Different Try a different design!
10
Build a bridge that “holds up” the laws of Physics, and…..
11
….Don’t Wait Until the Night Before
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.